My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0009279
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
2315
>
2900 - Site Mitigation Program
>
PR0544690
>
ARCHIVED REPORTS XR0009279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2019 1:14:39 PM
Creation date
7/24/2019 11:53:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009279
RECORD_ID
PR0544690
PE
3528
FACILITY_ID
FA0005839
FACILITY_NAME
CASTLE AUTOMOTIVE REPAIR INC.
STREET_NUMBER
2315
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12510017
CURRENT_STATUS
02
SITE_LOCATION
2315 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geological Technics lac. <br /> 1 101 7111 Street <br /> Modesto,Califomia 95354 <br /> (209)522-4119/Fax##5224227 <br /> October 29, 2002 <br /> Project No 7232 <br /> Project Name Valentine (Castle Motors) <br /> Mr Stephen Valentine <br /> 6232 Hemet Avenue <br /> Stockton, CA 95207 <br /> RE Work Plan Addendum Additional Site Characterization- Monitoring Well <br /> Installation <br /> Location Valentine (Castle Motors), 2315 N El Dorado Street, Stockton, CA <br /> Dear Mr Valentine <br /> In his October 22, 2002 letter, Mr Jeff Wong of Saiz Joaquin County PHS/EHD has <br /> requested an Addendum to our June 27, 2002 Additional Site Characterization Work Plan <br /> Mr Wong has mandated the following changes to our work plan that Geological Technics <br /> will incorporate as directed <br /> o Installation of three multi-chambered wells rather than five well sets The well <br /> construction details will be determined in the field <br /> * The proposed deep well MW-301 will not be installed <br /> o The first soil boring will be continuously cored from capillary fringe to total depth <br /> If you have any questions or need additional information, please contact me Thank you for <br /> this opportunity to serve your environmental needs <br /> Respectfully submitted, <br /> L-5-- <br /> Raynold I Kablanow 11, Ph D <br /> Vice President <br /> cc Jeff Wong— SJC PHS/EHD <br /> Marty Hartzell - CRWQCB-CVR <br /> USTCFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.