Laserfiche WebLink
r <br /> GEOTECHNICAL <br /> NEIL O. ANDERSON ENVIRONMENTAL <br /> A N D A $ S O C I A T E $ INSPECTIONS & TESTING <br /> I <br /> LABORATORY SERVICES <br /> POOL ENGINEERING <br /> POST TENSION DESIGN <br /> Mr. Tim R. O'Brien, Waste Discharge to Land Unit <br /> Lower San Joaquin River Watershed <br /> California Regional Water Quality Control Board <br /> Sacramento Main Office <br /> 11020 Sun Center Drive #200 <br /> Rancho Cordova, CA 95670 <br /> DEC 1 6 2004 <br /> ENVIRoiVi;;; <br /> December 13, 2004 PERMIT/SERVICESTH <br /> Dear Mr. O'Brien, <br /> First I would like to thank you for your time on Decembers 2nd, 2004, to discuss the Morada <br /> Produce Company site and to fill me in with some of the background and history associated <br /> with the WDR negotiations. The information you have given me will help with the project <br /> management of the site. <br /> As per our conversation I also wanted to request an unofficial extension until January 14th, <br /> 2005 to submit all three of the documents requested in the NOV dated September 9t", 2004. <br /> Morada Produce and I are aware that this extension will have no impact if the RWQCB does <br /> have to move ahead with ACL's, but due to the timelines we cannot reasonably meet the <br /> deadlines due to our late start. <br /> As we have only come into the project at the end of October we are now starting to achieve <br /> traction working on different facets of the project. Enclosed is the first of three items for <br /> you, Morada Produce Company's "Notice of Non-Applicability." We believe this is the <br /> appropriate form since Morada Produce uses all their water for irrigation on 150 acres of <br /> walnuts at the site (item 3A on the NONA). <br /> While at the site today, I have also observed the completed installation of three meters- <br /> exceeding the two previously requested by RWQCB- and inspected the hour meter on the <br /> irrigation pump (with an accompanying production chart from the well supplier) to give us <br /> volume flow on a fourth source. These installations were correlated with the supplier's <br /> specifications sheets. I also documented the installations with pictures that I took and will <br /> provide as part of the technical report. I will start the technical report detailing the meter <br /> installation of the 2nd item on the deliverables list and hope to have this to you prior to <br /> Christmas. The third item, the Operations and Maintenance Plan, will be a joint effort that <br /> we hope to complete early in the New Year. <br /> LODI • SACRAMENTO • MODESTO <br /> ENVIRONMENTAL DIVISION 902 Industrial Way•Lodi,California 95240 •209.367.3701 •FAX 209.369.4228 •ww.noanderson.corn <br />