My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010666
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
8660
>
3500 - Local Oversight Program
>
PR0508187
>
ARCHIVED REPORTS_XR0010666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 11:30:44 AM
Creation date
3/4/2020 11:13:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010666
RECORD_ID
PR0508187
PE
2950
FACILITY_ID
FA0007980
FACILITY_NAME
CHEVRON SERVICE STATION #9-3232
STREET_NUMBER
8660
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
STOCKTON
Zip
95210
APN
07917039
CURRENT_STATUS
01
SITE_LOCATION
8660 LOWER SACRAMENTO RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date July 13,2001 A110"COR <br /> 3,2001 "COR <br /> 1}i "" ` K wr c _ international Incorporated <br /> 01 JUL 16 P M 2 24 <br /> CHEVRON GROUNDWATER MUNI TORING REPORT (2Q2001) <br /> Primary Agency Harlin Knoll <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-3232 Address 8660 Lower Sacramento Road,Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International,Inc -- William Brasher <br /> Consultant Project No 077 43461 009 <br /> Assembly Bill 681 Status Property Owner Richard Berger, Berger and Company <br /> WORK PERFORMED THIS QUARTER: Second Quarter—2001: <br /> • 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> 3 Prepared and submitted work plan for additional site assessment activities <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter - 2001: <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 Perform site assessment activities <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling/Sate Assessment <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 33 to 34 feet <br /> Groundwater Gradient Southeast @ 0 003 fyft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.