My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005501
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
14800
>
3500 - Local Oversight Program
>
PR0545626
>
ARCHIVED REPORTS_XR0005501
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:28 PM
Creation date
4/29/2020 1:36:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005501
RECORD_ID
PR0545626
PE
3528
FACILITY_ID
FA0000957
FACILITY_NAME
LATHROP GAS & FOOD MART*
STREET_NUMBER
14800
Direction
S
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
19702004
CURRENT_STATUS
02
SITE_LOCATION
14800 S HWY 99 RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/// EX OCT <br /> 17 P � <br /> ~ �� 7844 Madison Avenue,Suit'k L • Fair Oaks,U 95628 <br /> E N V I R 0 T E C H , I N C . 1.800.242.5249 • Ph.916.535.0200 - Fax 916.535.0107 <br /> September 25, 1995 <br /> Mr. Jerry Moore . <br /> Moore Petroleum, Inc. <br /> 5491 'T" Street <br /> Banta, Calitomia 95-iO4,,'.;... <br /> Subject: Quarterly Groundwater.Monitoring & <br /> Remediation"Status Report <br /> Moore Petrel urn;;lnc <br /> 48U0,W Rage Ii�oad,'l► q 6ca., C,*Wornia <br /> Apex Project No ERA-02.009 <br /> Dear Mr. Moore: <br /> ht <br /> i <br /> E <br /> Apex nvroecInc..., A ex is-: : rovide Moore Petroleum,' {Moor :`•Petro a n); <br /> ' `� p � ( P ),� P to <br /> , P Ate,, Inc. <br /> this report documenting they res ,o©-"gA�arterly gr o dwater monitoring"condpatstt or A� J"4 16, <br /> :995, at the subject site:(Figurel). The mon:ivorang included collection of deipth-to-groundwater <br /> measurements and groundwater samplesfrom-mo4itpTiug wells MW-1 through MW-9 (Figure 2). <br /> This report also contains the quarterly results•of the remediation system operation from June 14, <br /> 1995, to date. <br /> This report is based, in part, on information obtauied from Moore Petroleum and Lmcon <br /> Associates of Sacramento, California (Emcon), and is subject to rnodifi,;ation as newly acquired <br /> information may warrant. <br /> BACKGROUND <br /> Apex began work at this site on June 14, 1995, after the groundwater monitoring conducted on <br /> May 9, 1995. by Emco-n. Prior to Emcon, work conducted at the site uicluded subsurface <br /> investigations and groundwater monitoring by Delta Environmental Consultant% Inc., of Rancho <br /> Cordova, Nations Groundwater.Associates of Sacramento, and Aegis Environmental, Inc. <br /> kAegis), of Roseville, California. Site details may be found in a "Quarterly Groundwater <br /> Monitoring Report," dated April 14, 1995, submitted to Moore Petroleum by E,mccn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.