Laserfiche WebLink
Date April 4,2002 _ EC )f"G <br /> lIn tteernLattii o neral IIyVVrp o rlatedd <br /> CHEVRON GROUNDWATER MONITORING REPORT (1Q2002) �� ^ J <br /> N/ A <br /> .a <br /> Primary Agency Mike Infurna / <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-1848 Address 1257 Yosemite Avenue,Manteca,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International, Inc — Roger Hoffmore <br /> Consultant Project No 77CH 00000 00 0006 <br /> Assembly Bill 681 Status Property Owner Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: First Quarter—2002. <br /> • 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER: Second Quarter- 2002: <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques Natural Attenuation <br /> Approximate Depth to Groundwater 13 71 to 14 29feet <br /> Groundwater Gradient North @ 0 005 ft/ft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CSI 95670 916 861 0400 916 861 0430 Fax wibw vecor com <br />