My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
3639
>
3600 - Recreational Health Program
>
PR0360059
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2021 4:44:59 PM
Creation date
12/20/2021 1:43:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3600 - Recreational Health Program
File Section
WORK PLANS
RECORD_ID
PR0360059
PE
3611
FACILITY_ID
FA0002292
FACILITY_NAME
LAGUNA PARK APARTMENTS
STREET_NUMBER
3639
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
09811005
CURRENT_STATUS
01
SITE_LOCATION
3639 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1z <br /> SCOPE OF WORK - POOL REVISIONS BY <br /> SK DM <br /> z/ S <br /> Drain Pool <br /> Strip Plaster to Substrate <br /> UL <br /> Reconfigure Entry Way Steps <br /> Top Step Tread to be 21"-24" <br /> O 2nd and 3rd Step Tread to be 12" <br /> t� D5 <br /> Step pRisen in Drs to be ail of Equal Height <br /> ShoDM Cb <br /> Eo_ <br /> Aj Install Trim Til <br /> � eon Shallow End Steps <br /> 3 Color TBD, Flush with Plaster, Slip-Resistant <br /> Tile to be of Contrasting Color to Plaster Finish <br /> C7R <br /> Shown in Detail D2 <br /> o DM <br /> ti <br /> Install Break Line Tile at 4 '/' Depth ~ <br /> 4 Min.4" to Max. 6" Tile Pattern <br /> Color TBD, Flush with Plaster, Slip-Resistant ; <br /> Tile to be of Contrasting Color to Plaster Finish 9 C <br /> D3 <br /> "-.$ 7 Remove and Replace Existing Waterline Tile c, Z C3 ° <br /> Standard 6x6 Poo! Tile °` ° o <br /> GR Remove and Replace Waterline Depth Markers • " Q ti <br /> QM <br /> White with 4"Black Lettering <br /> Sha • `�° W <br /> 6 <br /> Spaced dnoContain <br /> paFurther than 26 Apart <br /> � a <br /> p � <br /> .n DM <br /> Install New Deck Depth Markers <br /> Flush with Concrete,Whit with 4"Black Lettering 7 g <br /> Shall Contain the FT Symbol <br /> Spaced no Further than 25'Apart <br /> Shown in Detail D3 <br /> QM o ■rwwrwrwrwwarrrwrrwwrewrrwwwswwwwwwrrwwrrwwrawwrwwrrrwwrrrwwwwwrwwwrrrwrwwwr■ DM <br /> � ■rrwwrwrwrurwwwrawwrwww�wwwwwrrwurrwrruwwrwrrrwwrwrrrwwwrrrwrww■*rwrwwwrwaw <br /> Install "NO DIVE" Markers <br /> OInstall on Depths of 6'or less <br /> Flush with Concrete, Slip-Resistant Tiles <br /> Installed adjacent to depth markers on deck <br /> is Shown in Detail D3 <br /> Remove and Replace Coping on Pool <br /> Install Commercial Safety Grip Precast Coping <br /> O� f (99Overhang to be between 1"to 2" � <br /> 1 Slip-Resistant R <br /> li P` eslstant Surtace •t . , •� 2��i A46& <br /> Shown In Detail D1 Y r <br /> SK Replace Hand Rail at Shallow End Stairs <br /> Install Commercial 3-Bend Rail <br /> 10 Min.28"in Height from Deck and stairs <br /> � 1ry <br /> Non-Corrosive Material, Bonded <br /> ------------------ �' M Shown in Detail D4 <br /> r-- 3 D2 <br /> Main Drain <br /> DIA ,�1 Remove Existing and Install New Aquastar 32" Channel Drain <br /> Verify 3"Sump Depth <br /> Shown in Detail D5 <br /> DM <br /> HR <br /> Skimmers <br /> 90 D4 12 Equalizer Lines are Currently Split to 36"Apart <br /> Install Aquastar 10" Round Sumpless Covers <br /> 13 Prep and Plaster Pool with Premium White Altima Quartz Finish <br /> New Precast Concrete Caping CHANNEL DRAIN <br /> R GRATE <br /> A aRj .MENT S O <br /> New Coping Setting Contrasting <br /> Bed '/Z" min. <br /> Step/Bench TrimTileTHREE-PORTOUTLET COVER AND PVC MANUFACTURED <br /> M r <br /> Concrete Deck <br /> Plaster Finish in. Per Finish Shedule <br /> F3 2'1'TC h <br /> , . <br /> SL 1l" Per Ft. <br /> Ira, iIF <br /> a CERTIFIEDr• . • Y/ <br /> Oil— <br /> r <br /> SPECIFICATIONS 1,9 f P 208 GPM at,2.6 fps ii, 'it 316(JPN1 rul <br /> POOL SPECIFICATIONS <br /> Rating Sump Depth OpenAreaW <br /> Water Level FFATURES Urtl'3lockabf et Surface Area—746 Sq Ft ❑ <br /> AS III <br /> Perimeter-119 Ft Q <br /> _ . IrrlprovPd Water stop and slra'1 i design � —32,000 Gallons <br /> pn Volume ❑ <br /> I Plaster Finish ! ,. , r: +.: - <br /> -- —I I I=I ! I BQ �. 8 Turnover rate [ 6 hrs =89 GP <br /> � �= 11= Q ❑ <br /> Waterline Tile Ll•i1tl -= <br /> ,. <br /> EXISTING EQUIPMENT E 2 rn a <br /> C <br /> Er <br /> Q E Lo 6 <br /> Note; Pool Equipment is Existing, Installed by Others. No W Q -M M <br /> 3nss!ucflr>n Changes to Equipment are Included In Scope of Work by Z � F Q r <br /> TYPICAL COPING EDGE DETAIL CONTRASTING NOSING TILE :` `""`rqu+rrrh B U , <br /> n, d2 urkett s Pool Plasterin at Time of 3 <br /> .. g Contract Signing. <br /> Water Stop Feature <br /> 2r�a txrlj rr.�r � VJ POOL. W /�r� _C <br /> 0 CU cu <br /> " • • ` <br /> �•�n ada4i <br /> e LA .(*Fw..4 Lertmcate FILTER—450 Sq Ft Cartridge Filter 2 (� <br /> thlrrrr +cy €tli#t alrPUMP—Pentair SVRS{Potential 140 GPM @ 60 TDH) � O 1 <br /> CoF` tru t.rY,c ,r,�mare SANITIZER—300-29x = J M U) (n <br /> Min.28 in Aquastar 32" Channel Drain � I' � +�r�-rryv -V�. ��!_ ��>�+�.�_ � FLOW METER— Blue White <br /> Max.3 36 in VG$ Compliant with single suction-- ' �` `�-' ' �� � ' - FLOW METER READING—85 GPM <br /> Unblockable Drain SUCTION PIPE SIZE (Main Drain)—2" <br /> tiv€h Imp,'IctNlfretrx;x>tribl <br /> SUCTION PIPE SIZE (skimmer)—2" (x2) <br /> I or v;nyloption.lope page 129 RETURN PIPE SIZE—2" rDE7ite791273/202701 <br /> NO DIVING 3° Minimum Sump ',rl n t �;! .x, 11 fer•Ilassoption seepage 13rI <br /> 0 <br /> — <br /> FT 111JF1` ' w�,nr _ LEGEND 1/411 - 1 FT <br /> a , <br /> ■ j2LL*L?t}2-I�la[it <br /> BAL <br /> By <br /> 3 <br /> i 6Sump Built per <br /> Ali. <br /> Rkir <br /> NO aivrNG J Manufacturer's Instruction <br /> [a- <br /> i T, a I; ,:. - YAF Automatic Fill Device Job LAGUNA PARK <br /> , .___.._�.. <br /> DM Name..... : t!. I':� ,,; DepthMarker <br /> APTS.C©NTRASTING COLORS-BLACK ON v1+1-1ITE BACKGROUND <br /> LETTERING 11 1 �n,a. <br /> 12 in. 12 in. 21-24 in. ' w>? <br /> �. .• -— ' `�" <br /> sa4�:a• <br /> 'UNIVERSAL "NO DIVING' SYMBOL 'a°�rITH A A 4"RED CIRCLE AND SLASH GR Grab Rail Job <br /> SUCTION LINE f Number 1'I882v <br /> 1.32- rhr .F� t �c s HR — Hand Rail <br /> OVER THE SILHOUETTE OFA DIVER ... 2.2`Tap�ergdTtsreadedPpe P rx,� 2 _ <br /> Hand Rail is constructed with a non-corrosive material ,,. . , 2.2'Ta er,eer <br /> 4.32"Channel[ha n%I She d SK = Skimmer <br /> ! 5 32"CII OfaI n Film 4 Cover Sheet# 1 <br /> 6. 1C x 3l4'TB <br /> Flat Head lips. 396 S5.Qttr 16 UL Underwater Light <br /> 03 DEPTH MARKER SAMPLE o4 HAND RAILISTEP06 CHANNEL DRAIN VG82008Compliant %%I"`R)' Amgr *-_To Be RamawrlAr!bwGouni!WRa%rorAprfir.4r,-rr <br /> of 1 Sheets <br />
The URL can be used to link to this page
Your browser does not support the video tag.