My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1340
>
2300 - Underground Storage Tank Program
>
PR0529124
>
BILLING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2024 8:54:33 AM
Creation date
1/3/2022 3:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
RECORD_ID
PR0529124
PE
2351
FACILITY_ID
FA0019437
FACILITY_NAME
ARCO am/pm # 83230
STREET_NUMBER
1340
Direction
W
STREET_NAME
COLONY
STREET_TYPE
Rd
City
Ripon
Zip
95366
APN
261-590-110-000
CURRENT_STATUS
01
SITE_LOCATION
1340 W Colony Rd
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A NJO A QU I Environmental Health Department <br /> ill j N i y Jasjit Kang, REHS, Director <br /> SAN JOAQUIN COUNTY CERTIFIED UNIFIED PROGRAM AGENCY <br /> PERMIT TO OPERATE <br /> This permit is valid for Permit Status identified as "IN COMPLIANCE" <br /> Program <br /> Record ID Program Code and Description <br /> PRO529124 2300-UNDERGROUND STORAGE TANK FACILITY <br /> Underground Storage Tank Program: <br /> California Health and Safety Code,Div.20,Chap.6.7 and Title 23,California Code of Regulations,Chap.16. <br /> ....... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... ......... <br /> P/E Tank# CERS Tank ID Permit# Capacity Contents Permit Status System Type Leak Detection Pernit Valid <br /> 2350 1 10402351-001 PT0020125 20,000 REGULAR UNLEADED IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2022 To 12/31/2022 <br /> 2350 2 10402351-002 PT0020126 10,000 PREMIUM UNLEADED IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2022 To 12/31/2022 <br /> 2350 3 10402351-003 PT0020127 12,000 DIESEL IN COMPLIANCE DOUBLE-WALL Continuous Monitoring 1/1/2022 To 12/31/2022 <br /> Underground Storage Tank Permit Conditions <br /> 1) The Permit to Operate will become void if Annual Permit Fees and Service Fees are not paid and/or the UST system(s)fails to remain in compliance with these Permit Conditions. <br /> 2) In order to maintain the operating permit,the owner and operator shall comply with the H&S Code,Div.20,Chap.6.7 and 6.75;and CCR,Title 23,Chap.16 and 18,as well as any conditions <br /> established by San Joaquin County. <br /> 3) If the Tank Operator(s)is different from the Tank Owner,or if the Permit to Operate is issued to a person other than the owner or operator of the tank,the Permittee shall ensure that both <br /> the Tank Owner and tank Operator receive a copy of the permit. <br /> 4) Written Monitoring Procedures and an Emergency Response Plan must be approved by the Environmental Health Department(EHD)and are considererd UST Permit Conditions. The approved <br /> monitoring,response,and plot plans shall be maintained onsite with the permit. <br /> 5) The Permittee shall comply with the monitoring procedures referenced in this permit. <br /> 6) The Permittee shall perform testing and preventive maintenance on all leak detection monitoring equipment annually,or more frequently if specified by the equipment manufacturer,and <br /> provide documentation of such servicing to this office. <br /> 7) In the event of a spill,leak,or other unauthorized release,the Perrnitee shall comply with the requirements of Title 23 CCR,Chap.16,Art.5,and the approved Emergency Response Plan. <br /> 8) Written records of all monitoring performed shall be maintained on-site by the operator and be available for inspection for a period of at least three years from the date the monitoring was <br /> performed. <br /> 9) The EHD shall be notified of any change in ownership or operation of the UST system within 30 days of such change. <br /> 10) Upon any change in equipment,design or operation of the UST system(including change in tank contents or usage),the Permit to Operate will be subject to review,modification or <br /> revocation. <br /> 11) Construction,repair and/or removal permits are required from the EHD prior to any change,repair or removal of UST system equipment. <br /> 12) This Permit to Operate shall not be considered permission to violate any laws,ordinances or statutes of any other Federal,State or Local agency. <br /> 13) A"Conditional'Permit may be revoked if corrections specified on the inspection report are not completed by the date(s)indicated. <br /> _. <br /> ........................ ____. ......... ............. <br /> PERMITS TO OPERATE may be SUSPENDED or REVOKED for cause. <br /> PERMIT(s)Valid only for: RANJEET SINGH <br /> DBA: ARCO AM/PM#83230 -TOGOS <br /> Tank Owner: AASRA PETROLEUM, INC <br /> CERS ID 10402351 <br /> Regulated Facility: ARCO AM/PM#83230 Facility ID FA0019437 <br /> 1340 W COLONY RD Account ID AR0034561 <br /> RIPON CA 95366 Issued 12/7/2021 <br /> Billing Address: RANJEET SINGH <br /> RANJEET SINGH <br /> 1340 W COLONY RD <br /> Ripon CA 95366 <br /> 7124.rpt <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209-468-3420 F 209464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.