My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2900 - Site Mitigation Program
>
PR0500128
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2026 9:46:12 AM
Creation date
7/9/2026 9:42:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0500128
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0017784
FACILITY_NAME
CHEVRON-BANTA TERMINAL
STREET_NUMBER
22888
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23906019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\tchampion
Supplemental fields
Site Address
22888 KASSON RD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Boards <br />Central Valley Regional Water Quality Control Board <br />California Regional Water‘QuaTfty Control Board, Central Valley Region (Central Valley <br />Water Board) staff reviewed the 25 April 2012 First Quarter 2012 Groundwater <br />Monitoring Report (Report) prepared by ARCADIS U.S., Inc. (ARCADIS) on behalf of <br />the Chevron Environmental Management Company, for the Chevron Fuel Terminal <br />#1001621, 22888 Kasson Road in Banta (Site). The Report was submitted in <br />accordance with Monitoring and Reporting Program (MRP) No. R5-2007-0829 and <br />Clean Up and Abatement Order (CAO) No. R5-2002-0718. <br />The Report includes a summary of the First Quarter 2012 groundwater monitoring and <br />sampling data and requests modifications to the MRP. ARCADIS currently collects <br />groundwater from 83 wells onsite and offsite on a quarterly, semiannual, and annual <br />basis. ARCADIS recommends that monitoring wells currently on a quarterly sampling <br />schedule be sampled semiannually during the first and third quarters of each year. <br />They also recommend that off-site monitoring wells be sampled annually. <br />Central Valley Water Board staff prepared the attached draft MRP which incorporates <br />the requested changes to MRP No. R5-2007-0829. By 1 October 2012, please review <br />the attached draft MRP and provide comments. In the meantime, continue to monitor <br />the Site in accordance with MRP No. R5-2007-0829. <br />Mr. Mike Bauer <br />Chevron Environmental Management Company <br />145 S. State College Boulevard <br />P.O. Box 2292 <br />Brea, CA 92822 <br />DRAFT MONITORING AND REPORTING PROGRAM, CHEVRON BULK FUEL <br />TERMINAL #1001621, 22888 KASSON ROAD, BANTA, SAN JOAQUIN COUNTY <br />In summary, by 1 October 2012, please review the attached draft MRP and provide any <br />comments. If you have any questions regarding this letter, you may contact me at <br />(916) 464-4696 or by email at pveHines@waterboards.ca.qov. <br />V L- <br />Pat Vellines, P.G. <br />Engineering Geologist <br />cc: Mr. Michael Infurna, San Joaquin Environmental Health Department, Stockton <br />Mr. David Barnes, Chevron Products Company, Banta <br />Mr. David M. Lay, ARCADIS, Folsom <br />Karl E. Longley ScD. P.E., chair | Pamela C. Creedon P.E.. BCEE, executive officer <br />1 1020 Sun Center Drive #200. Rancho Cordova, CA 95670 I www waterboards ca.gov/centralvaliey <br />nrcrcieo p*rrn <br />ENVIRONMENTAL HEALTH! <br />PERMIT/SERV1CES <br />28 August 2012 <br />I; •?! Edmund G Brown Jr <br />HECHVEtg ;..... <br />eNVIHONMFNlAI kHQHCHUN <br />AUG 29 2012
The URL can be used to link to this page
Your browser does not support the video tag.