Laserfiche WebLink
bUNTY OF SAN JOAQUIN E.P. No. <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> .4 STOCKTON.CALIFORNIA 95201 <br /> (Date Issued) <br /> (209)468-3000 <br /> -1J <br /> DRIVEWAY ENCROACHMENT PERMIT 4 <br /> ----------- <br /> (Expiration Date) <br /> HENRY M.HIRATA <br /> DIRECTOR <br /> To: Location: <br /> 47175 plemout Blvd. <br /> CAA 94538 <br /> In compliance with your request of '-xti 19 and subject to all the terms, condi- <br /> tions and restrictions written below or p as gene <br /> as shown on <br /> Permission is hereby granted to construct <br /> Permit Application No. 96-331-Sli <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br /> hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) inch inside diameter per Section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE.AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br /> for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br /> roadway pavement to right-of-way (front property) line shall be surfaced with a two inch (2") minimum of asphalt <br /> concrete over a six inch(_—6 -11) minimum compacted layer of three-quarter inch(3/4")maximum size <br /> aggregate base material(road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br /> Caltrans Standard Specification, or with a four inch(4")minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades ofapproach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br /> ment surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris,lumber,barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition.The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> HENRY M. HIRATA, Director <br /> Department of Public Works <br /> By <br /> Section <br /> FORMS:_kdts�S1 R-13 WHITE Permittee GOLD-PWD Central File YELLOW-Field Inspection PINK-Permit Section PW 16(8194) <br />