Laserfiche WebLink
PROJECT APPLICAno,,�.--, <br /> FEE SCHEDULE <br /> APPLICATION . FEE COMPUTATION TOTAL- <br /> AP NX/ CLI -N-r <br /> GEOPHYSICAL SURVEY S150.00 <br /> Agreement Annuals <br /> ENCROAC MENT PERMIT 4 0 . �' 0 <br /> _ 4 <br /> FIELD MPECTION <br /> • Driveway with or without pipe 550.00 <br /> • Dnveu-ay wlta Box Culvert <br /> • Ptt d F:oatage S50-00.+.25/Ft <br /> • Curb,Gutter and/or Sidewalk S50.00+.50/Ft <br /> U1 LITY PFI IITS <br /> • Bell Holes,Cross-cuts, Splicepits 550.00 location <br /> • Bare(up to 6"Dial S50.00 location <br /> • Bore(over 6"Dia.) 550.00+S 10 ria <br /> LONGTT 'DDgAL CUTS - 10,Parts ' <br /> • DIRT: 0-1 oo ft 550.00+.25/ft <br /> >100-1;000 ft +.1011ft <br /> >1'000 ft +.05/ft <br /> • PAVED: 0-100 ft S50.00+.351ft <br /> >100-1,000 ft +.20/ft <br /> >1,000 ft +.10/ft <br /> TR,L SPORTATION <br /> • Single Trip $2 <br /> • Blanket Trip $ 7 <br /> • Custom Actual Cost <br /> (S]DO Amq) <br /> TOTAL <br />