Laserfiche WebLink
t o.R�`''�!• A&COUNTY OF SAN JOAQUIN <br /> � <br /> t � DEPARTMENT OF PUBLIC WORKS • E.P. No. <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE - <br /> �' STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 (Date Issued) <br /> DRIVEWAY ENCROACHMENT PERMIT > ; <br /> HENRY M. HIRATA (Expiration Date) <br /> DIRECTOR <br /> To: A t*.1 r t 1 F, r c e:: Location: <br /> f 1,.'_30 Gills%17c 'd ((77 <br /> CA <br /> In compliance with your request of -`� , 19 97 and subject to all the terms, condi- <br /> tions and restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to construct - t+ LiL vrtw4iy ca IPA,-mc = as shown on <br /> Permit Application No. 97-09'r-SS <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a <br /> hazard to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by <br /> the Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) 6 t<zia)) inch ( ") inside diameter per Section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch <br /> for drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), including flares for turning and/or paved frontage(s), from the edge of <br /> roadway pavement to right-of-way (front property) line shall be surfaced with a two inch (2") minimum of asphalt <br /> concrete over a :rs%r inch( �' ") minimum compacted layer of three-quarter inch (3/4")maximum size <br /> aggregate base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current <br /> Caltrans Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on pave- <br /> ment surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight (48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> No pipe is required under and across driv&V- <br /> approach at this time. However, if in the f• HENRY M. HIRATA, Director <br /> It is determined by the Cc-:-' t` L,t pipe l.`+'I: Department of Public Works <br /> required at this !oc tiot. i_ ! be tt ,y r- : ons <br /> bility of the grope:iy ova;" r to supply ries <br /> {pipe per County rcl-Juc-ements. <br /> By <br /> Permit Section <br /> FORMS: R-17,SS/WW WHITE-Permittee GOLD-PWD Central File YELLOW-Field Inspection PINK-Permit Section PW 16(8194) <br />