Route Direction Type Stage Scope of Work Duration Occurrence Days Hours <br /> 120 WB Full 2 Installation of closure pour 8 1 M- 2200-0600 <br /> forms Thurs <br /> 120 WB Full 2 Girder erection of Span 1 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 2 Girder erection of Span 2 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 2 Installation of deck forms 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB FuII 2 Removal of deck forms 8 I M- 2200-0600 <br /> Thurs <br /> 120 WB Full 3 Bridge demolition 16 1 M- 2000-1200 <br /> Thurs <br /> 120 WB Full 3 Installation of closure pour 8 1 M- 2200-0600 <br /> forms Thurs <br /> 120 WB Full 3 Girder erection of Span 1 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 3 Girder erection of Span 2 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 3 Installation of deck forms 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 3 Removal of deck forms 8 1 M- 2200-0600 <br /> Thurs <br /> 120 WB Full 5 Erect the overhead sign 4 1 M- 0200-0600 <br /> structure east of the Thurs <br /> interchange on 120(Phase <br /> 3) <br /> 120 WB Full 5 Construction of NB On and 8 1 M- 2200-0600 <br /> SB Off ramp intersections Thurs <br /> on North side of 120(Phase <br /> 3) <br /> 99/120 SB Full 1 Girder erection of Span 1 6 1 Sunday 2300-0500 <br /> -Thurs <br /> 99/120 SB Full 1 Girder erection of Span 2 6 1 Sunday 2300-0500 <br /> -Thurs <br /> The Closure Schedule shall show the locations and times when the proposed closures are to be in effect. <br /> The Contractor shall use the Closure Schedule request forms furnished by the Engineer. Closure <br /> Schedules submitted to the Engineer with incomplete, unintelligible, or inaccurate information will be <br /> returned for correction and resubmittal. The Contractor will be notified of disapproved closures or <br /> closures that require coordination with other parties as a condition of approval. <br /> Amendments to the Closure Schedule, including adding additional closures, shall be submitted to the <br /> Engineer, in writing, at least 3 working days in advance of a planned closure. Approval of amendments <br /> to the Closure Schedule will be at the discretion pof the Engineer. <br /> TS-20 3/3/05 , <br />