My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0155 (2)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0155 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:32:57 AM
Creation date
12/30/2015 2:22:22 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0155 (2)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
GRANITE CONSTRUCTION COMPANY
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
DETOUR SIGNS JOB#11005
Owners
Parcel Address
NORTH "E" ST.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
4 <br /> GRnniTE <br /> consTRucTion <br /> compRny SINCEE <br /> March 6, 2006 <br /> Re: REVISED Traffic Control Plan <br /> Project: Oakmore Meadows Unit 3 <br /> The attached diagram shows the proposed traffic control and detour plan for work taking <br /> place on Sanguinetti Lane for the above referenced project. <br /> There are three different stages to the traffic control plan: <br /> 1. Close sidewalk on West side of Sanguinetti for demolition of existing curb, gutter <br /> and sidewalk and well as installation of new improvements. This sidewalk <br /> closure would need to start approximately March 1, 2006 and remain closed until <br /> late April or May 2006. <br /> 2. Close Sanguinetti ,and detour traffic during the day(opened up after work hours) <br /> in order to install a new sewerline five feet East of centerline and services. This <br /> work would take approximately one week and would start approximately March <br /> 1, 2006. <br /> 3. Close Sanguinetti and detour traffic during the demolition and installation of the <br /> new traffic circle and curb, gutter and sidewalk on the East side of Sanguinetti. <br /> This would require Sanguinetti to be closed for the entire duration of this portion <br /> of work(approximately two to three weeks)both day and night (Contractor will <br /> install advance notification sign at least one week before closure—one <br /> northbound at Stadium and one southbound at Higgins). In addition,pedestrian <br /> traffic would also need to use the detour as both the East and West side sidewalks <br /> would be closed. This work would take place approximately April or May 2006. <br /> Any questions or comments on this traffic control plan should be directed to Stacy Case <br /> with Granite Construction Company(phone 209-234-3543). <br /> Stockton Branch <br /> P O Box 151 <br /> Stockton, CA 95201 <br /> (209) 982-4750 <br />
The URL can be used to link to this page
Your browser does not support the video tag.