My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0156
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:32:58 AM
Creation date
12/30/2015 2:22:24 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0156
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
PACIFIC GAS & ELECTRIC CO.
Contracts
CrossReference
Description
ENCROACHMENT PERMITS
DocCategory
Permit Applications (PA)
Notes
TRENCING & BORING JOB#73052-6
Owners
Parcel Address
JAHANT RD ( WEST) ALSO JAHANT RD (WEST)
Primary Parcel
Type (2)
30470796
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pacific Gas & Electric Co. 4/11/06 <br /> GC Gas Department <br /> P.O. Box 930 <br /> Stockton, CA 95201 <br /> (209)942-1745 <br /> SJ County Public Works <br /> Encroachment Permit Desk <br /> RE: Permit Application for PM 30470796 <br /> To Whom It May Concern, <br /> We will need to intermittently close one lane of traffic at a <br /> time on Jahant Road West at the intersection with Lower <br /> Sacramento Road. Due to the high volume of traffic we will <br /> use 2 flaggers to, assist with traffic control. <br /> We do not plan on having to leave any trench open <br /> overnight crossing Jahant Road West. If, however we do <br /> need to leave the trench open, it will be plated and the <br /> plates will be welded as well as pinned using railroad spikes. <br /> All signage for this project will be in accordance with <br /> CALTRANS Manual of Traffic Controls for Construction and <br /> Maintenance Work Zones. <br /> Th You, <br /> Randy Madera <br /> Sr. Field Engineer Tech <br /> Pacific Gas & Electric Co. <br /> (209)942-1748 <br />
The URL can be used to link to this page
Your browser does not support the video tag.