SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. Closure of Mountain House Parkway shall be allowed for one weekend per <br /> the approved detour plan. <br /> 2. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 3. Residents and businesses shall be notified in writing, as approved by the County, 48-hours in <br /> advance. <br /> 4. Any areas where parking is to be restricted shall have signs noticing the time period placed at <br /> least 48 hours in advance of the work. <br /> 5. Final paving for trench repair or road resurfacing shall be per Caltrans' specifications and shall <br /> not occur between November 1 and March 31 unless authorized by the County. <br /> 6. The contractor shall use: San Joaquin County Standard R-29 when backfilling trenches within the <br /> County right-of-way. Where the existing road structural section is below standard, a minimum <br /> section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br /> 7. The County Inspector shall be provided with work progress reports and update schedules every <br /> two weeks <br />