Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
0,41 NU.'304 L0002 <br /> 27/2006 08:40 TEICHERT CONSTRUCTION 4 94689324 <br /> WORK IN SAN]OA US 4 COUNTY RIGHT OF WAY,. <br /> MOUNTAIN 11OUSE PARKWAY I ROUTE 205 INTERCHANGE MODIFICATION <br /> EA260K-- <br /> RN R?SiKTMTE <br /> .......... <br /> 0 Mi <br /> 4. <br /> Contract Items m3 1,8()0 $18.00 $32,400 <br /> 190101 -RvRtion <br /> 194001 <br /> xc3 so $22.00 $1,760 <br /> Ditch Excav M3 330 $8-00 $2,640 <br /> 198001 ftedflorrow M2 2,000 $1,50 $3,000 <br /> 203016 S Erosion Control(Tvoe D) m3 1.728 $28.00 $48,384 <br /> 250401 Aggregate Subbase Class 4 m3 1 1,134 $4000 $45,360 <br /> 260201 A to 33asc Icn—, I -1:7A UP <br /> TONN: 1,664 5.00 <br /> 390102 A w Concrete(Type A) M 190 $5.00 — $950 Place A halt Dike(T E LS 1 $5,000.00 $5,000 <br /> 650069 FaLilifies m3 8 $500.00 $4,000 <br /> 731627 Mrnr Cnnc=retr fc Adewt*W Curb IS 1 $11$00.00 $11,500 <br /> 860M402 s U ht� WRM11AR aty Street} $27902 <br /> SUBT ,�AL ROADVIky <br /> SUBTOTAL CONSTRUCTION COST $229,862 <br /> $230,000 <br /> TOTALP T COST <br /> (f=final pay ftwl,a=spedalty hem) <br /> 4127120M <br /> M64ouae Final PSE Co Only Page 1 <br />