Laserfiche WebLink
OFFICE USE ONLY <br /> PROJECT APPLICATION <br /> FEE SCHEDULE <br /> GEOPHYSICAL SURVEY $255 <br /> Agreement Annuals ._ <br /> $115 or $115 or <br /> ENCROACHMENT PERMIT Time and Material Time and Material <br /> RON= <br /> Driveway with or without pipe $95 <br /> Driveway with Box Culvert $155 <br /> Paved Frontage $1001+$0.46/ft. <br /> Curb,Gutter,and/or Sidewalk $100+$0.98/ft. <br /> 01 M, <br /> Bell Holes,Cross-cuts,Splicepits $100/location <br /> Bore(up to 6" Dia.) $100/location <br /> Bore(over 6" Dia.) $100+$19M. <br /> ,pI ,m <br /> ' <br /> , <br /> „ <br /> 4n <br /> DIRT: <br /> 0-100 ft. $100+$0.49/ft. <br /> >100-1,000 ft. +$0.30/ft. J00 P C2 w A Ito 3 .DO . <br /> >1,000 ft. +$0.10/ft. <br /> PAVED- <br /> 0-100 ft. $100.00+$0..69/ft. /QQ C�S x . �1 117. 2-5 <br /> >100-1,000 ft. +$0.40/ft. <br /> >1,000 ft. +$0.20/ft. <br /> 1 <br /> <.,. •• w.apA U <br /> Single Trip $20 <br /> Blanket Permit $90 <br /> Actual Cost <br /> Custom ($160.00 MIN) p r <br /> TOTAL <br />