My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0202
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:33:40 AM
Creation date
12/30/2015 1:58:59 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0202
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
GEORGE & MEI TERANISHI
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-06-0202
Type (2)
CR029104
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CCeoldgicat Technics Inc. <br /> 1101 7'h Street . <br /> Modesto,Califomia 95354 <br /> (209)522-4119/Fax#522-4227 <br /> November 17, 2005 <br /> Project No.: 425.2 <br /> Project Name: George's Station <br /> George and Mei Teranishi <br /> 1600 Durham Ferry Road <br /> Tracy, CA 95304-8799 <br /> Re: Work Plan Addendum—In Situ Remediation Pilot Test <br /> George's Station, 1600 Durham Ferry Road,Tracy, CA <br /> Dear Mr. &Mrs. Teranh hi: <br /> On November 17, 2005 Mr. Nuel Henderson and Geological Technics Inc. (GTI) discussed <br /> amendments to the scope of work to be performed at.George's Station. GTI,requests the <br /> following changes to the March 21, 2005 Interim Remedial Action Plan and June 14, 2005 <br /> Feasibility Work Plan—.In-Situ Remediation Pilot Test: <br /> • Install an additional observation well for a total of two observation wells <br /> 0 The new observation well will be sampled in lieu of sampling.MW-2 <br /> • Change the locations of the sparging and observation wells as shown on the attached map <br /> • Collect up to two soil samples from each of the observation wells and analyze them for <br /> TPHg,BTEX and fuel oxygenates by EPA method 8015/8260 <br /> • Reduce the sampling interval for petroleum hydrocarbons during the pilot test from daily <br /> to every-other-day <br /> o Groundwater samples would be collected at the same interval as the Cr/Cr-1 sampling <br /> events reducing technician costs as well as analytical costs <br /> If you have any questions or need additional information,please contact me. <br /> Respectfully submitted, <br /> 7--" <br /> Ra nold 1�. Kablanow II Ph.D. <br /> Y , <br /> Vice President <br /> cc: Nuel Henderson--EHD - SJC <br /> Jim Barton - CRWQCB-CVR <br /> USTCFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.