My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0202
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0202
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:33:40 AM
Creation date
12/30/2015 1:58:59 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0202
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
GEORGE & MEI TERANISHI
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
EP-06-0202
Type (2)
CR029104
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Geological Teck�cks lnc. Page 4 <br /> IRAP—Pilot Test <br /> Project No. 425.2 <br /> June 14,2005 <br /> 2.1.1 Post Ozone Sparging Monitoring <br /> GTI will monitor and sample the observation wells for a month on a weekly basis after the <br /> completion of injection phase to check the post-injection effects. Water will be analyzed for <br /> the general field parameters (temperature, pH, DO, ORP & EC) as well as TPH-g, BTEX, <br /> MTBE, TBA,TBF, acetone, hexavalent chromium and iron as described above. <br /> 2.2 Proposed Soil Vapor Extraction Pilot Testing <br /> A Vapor Extraction System (SVE) pilot test will be performed prior to the Ozone Sparge test. <br /> The SVE, test will be conducted with portable equipment to reduce installation costs. The <br /> SVE test will utilize the two vapor wells previously emplaced in the excavation back fill area <br /> as described in the Plan (dated March 21, 2005). Extraction will be accomplished with a <br /> small Rotron blower with capacity of approximately 100 cfm. Emission treatment will be <br /> accomplished by use of two 55-gallon carbon units that will be recycled upon completion. <br /> If needed, a permit will be obtained from San Joaquin Valley Unified Air Pollution Control <br /> District to operate SVE system before the operation of the system. <br /> SVE system will be operated for approximately 24 to 48 hours prior to start of ozone <br /> sparging. Air samples (one sample after 10 minutes of operation, one sample after 12 hrs, 24 <br /> hrs and one at the end ofd operation period) will be taken during this operation to analyze for <br /> TPH-g, BTEX and MTBE. In addition, vacuum pressure measurements will be taken from <br /> monitoring wells and observation wells surrounding the tank excavation pit (MW-2, 5 & 8; <br /> OS-1, OW-1 &2). <br /> The SVE system will not be operated during the sparging process. However, SVE system <br /> will be operated for 24 hours after the completion of sparging period, and similarly three <br /> samples will be collected to compare with the background samples to check for migration of <br /> vapors by sparging and the feasibility of SVE system. <br /> 3.0 ASSESSMENT OF REMEDIAL EFFECTIVENESS <br /> Groundwater samples will be collected as described in Sections 2.1 & 2.1.1 prior to, during <br /> and after the ozone injection phase. GTI will analyze all the sample results at the end of pilot <br /> testing period to assess the remedial effectiveness of ozone sparging. <br /> Similarly, air sample results will be analyzed to evaluate the remedial effectiveness of the <br /> SVE system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.