Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
SPECIAL_ PROVISIONS <br /> Winter Weather Utility Work <br /> 1, SUPERVISION: The utility-company (permittee) shall fumish full-time supervision <br /> of all work to Insure full compliance with the permit provisions.. <br /> 2. START OF WORKS No work within the County right-of,way shall be started until the <br /> 'utility company representative has made an evaluation of weather conditions and <br /> has determined the work can be accomplished under the provisions of the permit: <br /> 3. CLEAN PAVEMENT: Dirt and mud shat(not be deposited on the'pevement <br /> outside the area of work, and if Inadvertently tracked onto the road travel way shall <br /> be removed Immediately. <br /> 4. DAILY RE TORATION: Private driveways and road Intersections shall be restored <br /> daily. <br /> 5. WEATHER-TIGHT CONDITION_ AI! trenches shall be filled and compacted, <br /> ditches and other drainage facilities regraded and opened, and the entire work area <br /> restored to weather-tight condition prior to any rain. <br />