My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0214 (3)
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0214 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:33:53 AM
Creation date
12/30/2015 2:03:48 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0214 (3)
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
CALIFORNIA WATER SERVICE
Contracts
CrossReference
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
TRENCHING & BORING JOB#73007
Owners
Parcel Address
S/S MAIN ST. BETWEEN COOLIDGE AVE & WAGNER AVE
Primary Parcel
Type (2)
7796
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
Special Conditions for <br /> ENCROACHMENT PERMIT <br /> 14. Roadway areas from 5 feet north of the Sanitary Sewer to the future gutter lip to the south shall <br /> receive a 0.12-foot asphalt concrete overlay. All pavement conforms shall be ground to provide a <br /> flush surface. Contractor shall grind and overlay within 10 working days of permanent trench <br /> paving. Shoulder areas shall be brought up to the finish grade as directed by the County. <br /> 15. Work on Main Street shall be coordinated with the County's Cardinal Avenue project so as not to <br /> interfere with scheduled detours. Contact John Robles at (209)468-3017. <br /> 16. All work on Main Street shall be completed prior to August 31, 2006 to avoid conflict with the Main <br /> Street resurfacing project. (Del Mar Avenue to Gillis Road) <br /> 17. School buses shall be passed through the work zone with minimal delay. Children walking to <br /> school shall be escorted through the work zone. <br /> 18. Frontages of commercial properties shall not be blocked in a manner that restricts access of the <br /> public to the site. <br /> 19. Coolidge Avenue, Carroll Avenue, Dawes Avenue, and Wagner Avenue were overlayed last year <br /> so any pavement cuts within these streets shall require roadway to be repaved form centerline to <br /> edge of pavement. <br /> 20. Contractor shall only bore across Main Street, trenching across Main Street shall not be allowed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.