Laserfiche WebLink
Special Conditions for <br /> ENCROACHMENT PERMIT <br /> 14. Roadway areas from 5 feet north of the Sanitary Sewer to the future gutter lip to the south shall <br /> receive a 0.12-foot asphalt concrete overlay. All pavement conforms shall be ground to provide a <br /> flush surface. Contractor shall grind and overlay within 10 working days of permanent trench <br /> paving. Shoulder areas shall be brought up to the finish grade as directed by the County. <br /> 15. Work on Main Street shall be coordinated with the County's Cardinal Avenue project so as not to <br /> interfere with scheduled detours. Contact John Robles at (209)468-3017. <br /> 16. All work on Main Street shall be completed prior to August 31, 2006 to avoid conflict with the Main <br /> Street resurfacing project. (Del Mar Avenue to Gillis Road) <br /> 17. School buses shall be passed through the work zone with minimal delay. Children walking to <br /> school shall be escorted through the work zone. <br /> 18. Frontages of commercial properties shall not be blocked in a manner that restricts access of the <br /> public to the site. <br /> 19. Coolidge Avenue, Carroll Avenue, Dawes Avenue, and Wagner Avenue were overlayed last year <br /> so any pavement cuts within these streets shall require roadway to be repaved form centerline to <br /> edge of pavement. <br /> 20. Contractor shall only bore across Main Street, trenching across Main Street shall not be allowed. <br />