Laserfiche WebLink
August 1$, 2006 <br /> PROJECT NAME: French Camp Road Widening(S.T.A.A.) <br /> Application No.: Job No.: 11005 <br /> Final Engineer's Estimate: $5,454.50 <br /> Final Engineer's Estimate for Phase II (if applicable): <br /> Total Engineer's Estimate $5,454.50 <br /> Plan Check Fee: <br /> 7.22 % of$50,000.00 $393.81 <br /> 4.20 % of$250,000.00 <br /> 1.95 % of ( $5,454.50 -$300,000.00) <br /> -------------------------- <br /> Subtotal $393.81 <br /> Field Inspection Fee: <br /> 8.86 % of $ 200,000.00 $483.27 <br /> 3.85 % of $ 300,000.00 <br /> 2.75 % of $ 5,454.50 -$500,000.00) <br /> 2.25 % of ( -- -$1,000,000.00) <br /> -------------------------- <br /> Subtotal $483.27 <br /> TOTAL FEES: $393.81 + $483.27 = $877.08 <br /> Fees paid to date: <br /> Date: Check No.: <br /> Date: Check No.: <br /> Total $0.00 <br /> Balance Due: $877.08 - $0.00 <br /> cAforms\subd\Subd Plan Check-Field Insp Fetes 8/18/2006 <br /> (S. Harit) <br />