Laserfiche WebLink
OFFICE USE ONLY <br /> c PROJECT APPLICATION <br /> FEE SCHEDULE <br /> Olop <br /> OM <br /> GEOPHYSICAL SURVEY $� <br /> Agreement Annuals <br /> e <br /> r $115or <br /> ENCROACHMENT PERMIT -rteMaterfal Time and Material <br /> Driveway with or without pipe $95 <br /> --! 7— <br /> Driveway with Box Culvert $155 <br /> Paved Frontage $100+$0.46/ft. <br /> Curb,Gutter,and/or Sidewalk $100+$0.9e/ft. <br /> IS <br /> Bell Holes,Cross-cuts,Spiloe'pfts $100/iooatlon <br /> Bore(up to 6"Dia.) $100/location <br /> Bore(over 6"Dia.) $100+$19/ln. <br /> DIRT: <br /> 43A 00 ft. $100+$0.49/ft. <br /> >100-1,000 ft. +$0.30/ft• <br /> >1,000 ft. +$0.10/ft. <br /> PAVED- <br /> 0-100 <br /> 0-100 ft. $100.00+$0.69/ft. �l l�Q .f C. f.I /00 <br /> >100-1,000 ft. +$0.40/ft. O. Ya 43.10. 00 <br /> >1,000 ft. +$0.20/ft. d <br /> Single Trip $20 <br /> Blanket Permit $90 <br /> Custom Actual Cost <br /> ($180.00 MIN) <br /> TOTAL_ 9 5�• t7 <br />