My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0293
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2006
>
EP-06-0101 thru EP-06-0300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2006_EP-06-0101 thru EP-06-0300_ - EP-06-0293
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:35:20 AM
Creation date
12/30/2015 1:57:42 PM
Metadata
Fields
Template:
Permits_Development
DocName
EP-06-0293
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2006\EP-06-0101 thru EP-06-0300
Year2
2006
Supplemental fields
Applicant
PULTE HOME CORPORATION
Contracts
CrossReference
Description
ENCROACHMENT PERMITS
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
E/S AIRPORT WY APPROX UNDER THE SOUTHRN PAC RR TRK
Primary Parcel
EP-06-0293
Type (2)
CR030280
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1• Closure of Airport Way is approved for 6 weeks and closure of Union Road is approved pproved for 5 <br /> 2. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 m' <br /> in approved road closure areas,two-way traffic shall be maintained during non-workingh <br /> excavated areas backfilled or plated. During working hours, two-way mutes. Except <br /> maintained with one lane open and a ours with <br /> appropriate flaggers. Y traffic control shall be <br /> 3. Access to all properties; shall be maintained at all times except when work is occur <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Drivew nng at the <br /> contractor shall be replaced with in-kind or better materials. aYs disturbed by the <br /> 4• Residents and businesses shall be notified in writing, as approved by the Count <br /> advance of any impacts to their access. Y, 48-hours in <br /> 5• Any areas where parking is to be restricted shall have signs noticing the time er' <br /> least 48 hours in advance of the work. p iod placed at <br /> 6. Existing fences shall not be removed without written consent signed by theproperty <br /> submitted to the County prior to the removal. Fences removed shall be res ored h'n-kin owner and <br /> better materials at the edge of the right-of-way. d or <br /> 7• No trench cutting of County roads shall occur between November 1 and Mar <br /> authorization by the County. ch 31 without prior <br /> 8. Final paving for trench repair or road resurfacing shall be per Caltrans' s eci <br /> not occur between November 1 and March 31 unless authorized by the County. ions and shall <br /> 9• Trenches shall be maintained in a smooth and even condition to the satisfaction of <br /> throughout the project limits at all times. the County <br /> 10. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete <br /> edge to edge of pavement. All pavement conforms shall be ground to provide a flush surfa <br /> from <br /> Shoulder areas shall be brought up to the finish grade as directed by the County. ce. <br /> 11. Contractor shall establish existing roadway and drainage grades within the constr <br /> Any repair to roadways and adjacent areas shall match existing grades. An uction area. <br /> changes shall receive prior approval from County. Y proposed grade <br /> 12. Any areas where parking is to be restricted shall have signs noticing <br /> least 48 hours in advance of the work. g ung the time period placed at <br /> 13. Additional signs shall be placed at Roth Road and French Cam <br /> freeways prior to traffic reaching the closure. P Road to divert traffic to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.