Laserfiche WebLink
A ulk COUNTY OF SAN JOAQUIN DW EP No: DW-07 81'Nvv-- <br /> �o COG DEPARTMENT OF PUBLIC WORKS Date Issued: 6/26/2007 <br /> �{ P.O. BOX 1810 1810 E. HAZELTON AVENUE Expiration Date: 6/25/2008 <br /> STOCKTON,CALIFORNIA 95201 -- - - - - <br /> (209)468-3000 Job No: 11005 <br /> 9' •.....:ra�P FAX#(209)468-9324 APN No: 025-160-41 <br /> - <br /> DRIVEWAY ENCROACHMENT PERMIT CR# 032468 <br /> To: LARRY MATHEWS Location: 2515 W.SARGENT RD.: N/S OF SARGENT <br /> 2647 RIO BRAVO CIR. <br /> -- RD. 800'E/O DE VRIES RD. <br /> SACRAMENTO, CA 95826 <br /> In compliance with your request of 6/14/2007 tnd subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct ZONE DRIVEWAY APPROACH shown on <br /> --_ � - <br /> Permit Application No. DW-07 81 NW . <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A n SEE STAMP ( _ ") inside diameter per section 62 of the current Caltrans Standard <br /> ( ) `- ' Ir1Ch SEE STAMP <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way(front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a SIX inch ( 6 ") minimum compacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> WHITE -Permittee Department of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW Field Inspection <br /> PINK Permit Section <br /> By <br /> FORMS: R-17, SS/WW P rmit section <br /> Access\Permits\Forms\Driveway E Permit mo Pi Pe IS-required under-and across-driveway-- Revised 07/2000 <br /> approach at this time. However, if in the future <br /> �t is determined by the County that pipe will be <br /> ,-equired at this location, it shall be the responsi- <br /> aility of the property owner to supply needed <br /> ai,pe per County requirements. <br />