My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_Drive Way Permits_DW-07-101 thru DW-07-151_ - DW-07-145
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
Drive Way Permits
>
DW-07-101 thru DW-07-151
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_Drive Way Permits_DW-07-101 thru DW-07-151_ - DW-07-145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:26:31 AM
Creation date
12/30/2015 10:38:26 AM
Metadata
Fields
Template:
Permits_Development
DocName
DW-07-145
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\Drive Way Permits\DW-07-101 thru DW-07-151
Year2
2007
Supplemental fields
Applicant
Contracts
CrossReference
Description
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
pquir� COUNTY OF SAN JOAQUIN DW EP No: DW-07 145 SW <br /> �o.• co DEPARTMENT OF PUBLIC WORKS <br /> •.G Date Issued: 11/1/2007 <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> y; Expiration Date: 10/31/2008 <br /> STOCKTON,CALIFORNIA 95201 --- <br /> (209)468-3000 Job No: 11005 <br /> C���FORN`p FAX#(209)468-9324 APN No: 253-330-36 <br /> DRIVEWAY ENCROACHMENT PERMIT CR# 033477 <br /> To: RIMROCK, INC. Location: 28557 S. LEHMAN RD.: W/S OF LEHMAN RD. <br /> 28290 S. BANTA RD. <br /> 500'S/O LINNE RD. <br /> TRACY, CA 95304 <br /> - <br /> In compliance with your request of 10/31/2007 tnd subject to all the terms, conditions and <br /> restrictions written below or printed as general or special provisions on any part of this form. <br /> Permission is hereby granted to constuct ONE DRIVEWAY APPROACH shown on <br /> Permit Application No. DW-07 145 SW <br /> Jobsite shall be kept in a safe condition at all times by removing daily any excess dirt or debris which might be a hazard <br /> to pedestrian and/or vehicular traffic. Adequate lights, signs and barricades shall be placed and maintained by the <br /> Permittee for the protection of the public in accordance with the current Caltrans Standard Specifications. <br /> A(n) SEE STAMP inch ( SEE STAMP ") inside diameter per section 62 of the current Caltrans Standard <br /> Specifications, ALTERNATIVE PIPE AND PIPE ARCH CULVERTS, shall be installed in roadside drainage ditch for <br /> drainage flow maintenance and shall be of sufficient length to clear toe of approach fill or headwalls. <br /> The entire area of driveway approach(es), include flares for turning and/or paved frontage(s), from the edge of roadway <br /> pavement to right-of-way (front property) line shall be surfaced with a two inch (2") minimum of asphalt concrete over <br /> a FOUR inch ( 4 ") minimum compacted layer of three-quarter inch (3/4") maximum size aggregate <br /> base material (road gravel) conforming to Class 2 Aggregate Base specified in Section 26 of the current Caltrans <br /> Standard Specification, or with a four inch (4") minimum of portland cement concrete. <br /> If portland cement concrete pavement is installed, expansion joints shall be provided at the edge of pavement and <br /> along property line. Surface grades of approach(es) and/or to open ends of pipe. No ponding nor puddles on <br /> pavement surface shall be allowed. <br /> The Field Engineering Division of this office shall receive no less than forty-eight(48) hours notice prior to <br /> beginning of any work within the County right-of-way. After completion of the work permitted herein, all <br /> debris, lumber, barricades or any excess material shall be removed and the jobsite left in a neat workmanlike <br /> condition. The Permittee shall fill out and mail notice of completion provided by Grantor. <br /> Driveway(s) shall be complete prior to occupancy <br /> of the residence, but not to exceed expiration date. <br /> THOMAS R. FLINN, Director <br /> WHITE -Permittee Department of Public Works <br /> GOLDENROD -PWD Central File <br /> YELLOW Field Inspection <br /> PINK Permit Section <br /> By <br /> FORMS: R-17, SS/W\h' Per section <br /> Access\Permits\Forms\Driveway E Permit Revised 07/2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.