Laserfiche WebLink
Ut-t-IUL U51t UNLY <br /> PROJECT APPLICATION <br /> FEE SCHEDULE <br /> GEOPHYSICAL SURVEY $255 <br /> Agreement Annuals <br /> ENCROACHMENT PERMIT $115 or 11 r <br /> Time and Material Time andMaterial <br /> Driveway with or without pipe $95 <br /> Driveway with Box Culvert $155 <br /> Paved Frontage $100+$0.46/ft. <br /> Curb, Gutter,and/or Sidewalk $100+$0.98/tt. <br /> Bell Holes,Cross-cuts,Splicepits $100/location <br /> Bore(up to 6" Dia.) $100/location <br /> Bore(over 6'Dia.) $100'+$1911n. <br /> DIRT: <br /> 0-100 ft. $100+$0.49/ft. Ibo + CSO,y9 x ioo) I qq <br /> >100-1,000 ft: _. +$0.30/ft. p 30 x Zo !a <br /> >1,000 ft. +$0.10/ft. <br /> PAVED: <br /> 0-100 ft. $100.00+$0.69/ft. <br /> >100-1,000 ft. +$0.40/ft. <br /> >1,000 ft. +$0.20/ft. <br /> Single Trip $20 <br /> Blanket Permit $90 <br /> Custom Actual Cost <br /> ($160.00 MIN) <br /> TOTAL ZOO. <br />