Laserfiche WebLink
3 �r5 <br /> C:K.UL l3KOT WRS Pothole Procedures cont. pg 2 <br /> Procedure for Safe Dig <br /> Stepi -Prior To location of pothole,area is crleerod of wa ictiug utilities. <br /> Stcp2 -Removc conorete or asphalt as needed. <br /> Step3 -Hole is cleared by Inowning material with airknife,then remove with Univac. <br /> Continue this process till desired depth is reached <br /> Procedure for Specific Utility <br /> Step -Confirm location of the utility to be potholed. <br /> Step2 -Hole is cleared by loosening material with aiftife,then remove with Univac- <br /> Continue this process till utility is exposed. <br /> Step3- Document,type of utility,compassion of pipeline,exact depth,and size of utility <br /> on Pothole Log. (SM Attached) <br /> Procedure for Back Fill <br /> Stepl -Remove material fonts Univac. <br /> Step2-Compact to desired compaction rate. <br /> Step3 -once compaction is completed.Cover pothole With top grade Spacs. <br />