My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-051 thru EP-07-100_ - EP-07-072
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-051 thru EP-07-100
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-051 thru EP-07-100_ - EP-07-072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:39:46 AM
Creation date
12/30/2015 9:10:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-072
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-051 thru EP-07-100
Year2
2007
Supplemental fields
Applicant
FUGRO WEST, INC.
Contracts
CrossReference
Date Entered
3/30/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
VARIOUS LOCATIONS IN MORADA AREA
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3 �r5 <br /> C:K.UL l3KOT WRS Pothole Procedures cont. pg 2 <br /> Procedure for Safe Dig <br /> Stepi -Prior To location of pothole,area is crleerod of wa ictiug utilities. <br /> Stcp2 -Removc conorete or asphalt as needed. <br /> Step3 -Hole is cleared by Inowning material with airknife,then remove with Univac. <br /> Continue this process till desired depth is reached <br /> Procedure for Specific Utility <br /> Step -Confirm location of the utility to be potholed. <br /> Step2 -Hole is cleared by loosening material with aiftife,then remove with Univac- <br /> Continue this process till utility is exposed. <br /> Step3- Document,type of utility,compassion of pipeline,exact depth,and size of utility <br /> on Pothole Log. (SM Attached) <br /> Procedure for Back Fill <br /> Stepl -Remove material fonts Univac. <br /> Step2-Compact to desired compaction rate. <br /> Step3 -once compaction is completed.Cover pothole With top grade Spacs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.