Wildwood Road <br /> SPECIAL CONDITIONS FOR <br /> ENCROACHMENT PERMIT <br /> 1. All work shall be in accordance with the approved Improvement Plans for this project. <br /> 2. Maintain traffic controls for all roads. Traffic control delays shall not exceed 15 minutes. <br /> Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br /> plated. During working hours, two-way traffic control shall be maintained with one lane open and <br /> appropriate flaggers. <br /> 3. Access to all properties shall be maintained at all times except when work is occurring at the <br /> access point. Minimal delays will be allowed to provide access within the work zone area. <br /> Driveway access shall be fully restored at the end of each workday. Driveways disturbed by the <br /> contractor shall be replaced with in-kind or better materials. <br /> 4. Residents and businesses shall be notified in writing, 48-hours in advance of any impacts to their <br /> access. <br /> 5. Existing fences shall not be removed without written consent signed by the property owner and <br /> submitted to the County prior to the removal. Fences removed shall be restored with in-kind or <br /> better materials at the edge of the right-of-way. <br /> 6. Final paving for road surfacing shall be per Caltrans' specifications and shall not occur between <br /> November 1 and March 31 unless authorized by the County. <br /> 7. The total length of open, unbackfilled roadway excavation shall be limited to what can be <br /> completed in one working day. All excavations for roadway widening shall be completely <br /> backfilled to the level of final subgrade at the end of each workday, and the roadway restored to <br /> two-way traffic. <br /> 8. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br />