My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-101 thru EP-07-150_ - EP-07-116
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-101 thru EP-07-150
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-101 thru EP-07-150_ - EP-07-116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:40:48 AM
Creation date
12/30/2015 9:17:35 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-116
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-101 thru EP-07-150
Year2
2007
Supplemental fields
Applicant
ADVANCED GEOENVIRONMENTAL, INC.
Contracts
CrossReference
Date Entered
5/4/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
VARIOUS ROADS IN COUNTRY CLUB AREA
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. John Parker <br /> Boulevard Auto <br /> 2151 Country Club Blvd., Stockton <br /> Page 2 of 2 <br /> The EHD was concerned that the petroleum plume was not laterally or vertically <br /> defined and that the proposals included did not adequately address this concern. <br /> After discussing the concerns in detail, the following items were agreed upon: <br /> • Seven (7) monitoring wells are to be installed in hydrological unit (HU) 2 and <br /> six (6) monitoring wells were to be installed in HU-4. A work plan for the <br /> installations is to be submitted to the EHD by January 19, 2007 and, <br /> • A vapor intrusion evaluation (sampling) work plan is to be submitted to the <br /> EHD by January 19, 2007. <br /> Also discussed at the meeting was your consultant's recommendation to conduct a <br /> ground water extraction (GWE) feasibility/pilot test to evaluate this potential remedial <br /> option. The recommendation included installing at least one GWE well, conducting a <br /> pumping test, and evaluating the findings in a report to be submitted to the EHD. <br /> The EHD agreed that this recommendation could be warranted in the near future but <br /> would require the agreed upon monitoring well installations to be completed prior to <br /> conducting this test. If your consultant feels that GWE testing is still warranted, <br /> please submit a feasibility study to the EHD that discusses and compares the <br /> details, cost, time requirements and technical justifications for multiple remedial <br /> alternatives that could work at this site. If your consultant feels that the ground water <br /> petroleum plume is unstable or threatening a drinking water (well, surface supply, <br /> etc), please have them include a technical justification in support of interim remedial <br /> action (TRAP). <br /> Thank you again for your cooperation in the required investigation for this site. You <br /> may contact Michael Infurna at (209) 468-3454 should you have any questions or <br /> wish to discuss the site. Mr. Infurna can be reached by electronic mail at <br /> minfurnaasicehd com. <br /> Donna Heran, RENS, Director <br /> Envir nmenta! Heal h /epa ent <br /> Michael J. Infurna , r. S <br /> enior REHS Nuel C. Henderson Jr., PG <br /> LOP / Site Mitigation Unit IV LOP / Site Mitigation Unit IV <br /> MI/ <br /> cc: CVRWQCB —James L. Barton, Sacramento <br /> SWRCB Technical — Mark Owens, Sacramento <br /> AGE - Tim Cuellar, 837 Shaw Rd, Stockton <br /> Chevron Texaco EMC — Darin L. Rouse, PO Box 6012 K2260 <br /> San Ramon, CA, 94583 <br />
The URL can be used to link to this page
Your browser does not support the video tag.