Laserfiche WebLink
Scott Cooper <br /> From: Tom Okamoto <br /> Sent: Thursday, May 31, 2007 12:52 PM <br /> To: 'Todd Greenwood' <br /> Cc: Scott Cooper <br /> Subject: RE: 8 mile/ L Sacto signal timing <br /> Todd- <br /> If there is going to be advance signage or CMS warning westbound Eight Mile Road motorists <br /> of this closure and detour east of the intersection, there needs to be an encroachment <br /> permit for the sign placement on the approach leg. If this is on Monday, this a sketch <br /> should be sent in immediately by DSS. <br /> As for the signal timing, Traffic has arranged for the timing to be 40 seconds for the WB <br /> left turn lane during the detour. <br /> -----Original Message----- <br /> From: Todd Greenwood [m.ailto:Todd.Greenwood@ci.stockton.ca.us] <br /> Sent: Thursday, May 31, 2007 12: 12 PM <br /> To: Tom Okamoto <br /> Cc: Gary Tsutsumi <br /> Subject: 8 mile / L Sacto :signal timing <br /> As part of a paving operation on 8 mile ,west of L Sacto, the contractor will be closing <br /> westbound 8 mile road periodically during the week of June 4th. Eastbound 8 mile traffic <br /> will be maintained through the paving work zone at all times. <br /> The westbound detour will direct traffic south on L Sacto to Hammer and return to 8 mile <br /> via Thornton Rd. <br /> To accommodate the additional demand on the WB left turn phase, please increase the max <br /> green time to 40 seconds on the WB left turn phase at the <br /> 8 mile/L Saco signal. <br /> Thanks <br /> TG <br /> 1 <br />