Laserfiche WebLink
Ut-t-'Ut U61t UNLY <br /> PROJECT APPLICATION <br /> FEE SCHEDULE <br /> GEOPHYSICAL SURVEY <br /> Agreement Annuals $255 <br /> ENCROACHMENT PERMIT $115 or <br /> Time and Material 115 <br /> Time aterial <br /> Driveway with or without pipe $95 <br /> Driveway with Box Culvert $155 <br /> Paved Frontage <br /> $100+$0.46/ft: <br /> Curb, Gutter,and/or Sidewalk <br /> $100+$0.98/ft. <br /> Bell Holes,Cross-cuts,,Splicepfts <br /> $100/location <br /> Bore(up to 6"Dia.) Ido <br /> $100/location <br /> Bore(over 61 Dia.) <br /> $100+$79M. <br /> DIRT: <br /> 0-100 ft. <br /> $100+$0.49/ft. <br /> >100-1,000 ft: <br />_ . +$0.30/ft. <br /> ------------- <br /> >1,000 ft. <br /> +$0.10/ft. <br /> PAVED: <br /> 0-100 ft. <br /> $100.00+$0.69/ft. <br /> >100-1,000 ft. <br /> +$0.40/ft. <br /> >1,000 ft. <br /> +$0.20/ft. <br /> 111 AN <br /> Single Trip <br /> $20 <br /> Blanket Permit <br /> $90 <br /> Custom Actual Cost <br /> ($160.00 MIN) <br /> TOTAL �ZIS, <br />