My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-201 thru EP-07-300
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-201 thru EP-07-300_ - EP-07-266
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:44:43 AM
Creation date
12/30/2015 9:52:02 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-266
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-201 thru EP-07-300
Year2
2007
Supplemental fields
Applicant
GEOSYNTEC CONSULTANTS
Contracts
CrossReference
Date Entered
8/30/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF WELTY RD. APPROX. 1,000 FT. N/O STE. HWY.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Health and Safety Plan (HASP) - Template A <br /> Project Name: Western Farm Service Vernalis <br /> Project Number: WR0949 <br /> This HASP, which must be kept on site, addresses the safety and health hazards of each <br /> phase of site operation, including the requirements and procedures for worker <br /> protection. Only the Site Health and Safety Officer (SHSO) can change or amend this <br /> document in agreement with the Environmental Health and Safety Coordinator(EHSC), <br /> Project Manager„ and Principal-in-Charge. The SHSO must initial any change made to <br /> the HASP at the relevant section. Major amendments (e.g., changes in personal <br /> protective equipment not provided for in this plan, addition of tasks, etc.) must be <br /> documented by indicating the amendment date shown on this page. <br /> Prepared by: Nate Mullaugh �� <br /> SHSO <br /> Dat <br /> Reviewed by: Arnab Chakrabarti 74- ��G ��� (~ VIVO �L <br /> EHSC Date <br /> Approved by: Arnab Chakrabarti [(-7/,1 <br /> Project Manager ,.-� Date <br /> Carolyn Kneiblher � \ \'z—r c t <br /> Principal-in-Charge/Associate-in-Charge Date <br /> Copy Cover Sheet to: EHSC <br /> Brief Description of Amendment Amendment Date <br /> This HASP has been given to the following subcontractor(s) in accordance with <br /> OSHA 29 CFR 1910.1200 (Hazard Communication Standard): <br /> Subcontractor: — Representative: Date: <br /> Subcontractor: _ Representative: Date: <br /> Vemalis_?007_HASP.doc i <br /> 16 July 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.