Laserfiche WebLink
COUNTY OF SAN JOAQUIN <br /> 'oPgU tN'"Cp DEPARTMENT OF PUBLIC WORKS <br /> Q Gym P.O.BOX 1810-1810 HAZELTON AVENUE EP No EP-07 284 NS <br /> to: :< STOCKTON CALIFORNIA 95201 Date Issued: 09/13/2007 <br /> (209)468-3000 <br /> FAX#(209)468-9324 Expiration Date: 10/15- - <br /> } �`P Job No: 11005 <br /> ENCROACHMENT PERMIT UE/CR/PM NO: <br /> To: LEVEL 3 COMMUNICATIONS,LLC Encroachment Type: BELL HOLE&BORE <br /> -- - <br /> 1075 TRIANGLE CT. Location: INTERSECTION OF ALPINE AVE..&WEST LANE <br /> WEST SACRAMENTO,CA 95605 <br /> In compliance with your request of 8/6/2007 permission is hereby granted to do work in County right of way <br /> as shown on attached application and subject too alFthe terms;conditions and restrictions written below or printed as general or special provisions <br /> on any part of this form. See reverse side and attached sheet,if any. <br /> Trench excavations for service connections will not be permitted within ten feet(10')of pavement centerline unless otherwise approved by the <br /> Director. Surface of trench patches shall match in kind and be smooth and even with that of abutting surface. Special attention shall be given to <br /> depth of utilities through roadside area in anticipation of future drainage facilities,road profile and/or frontage development. All underground <br /> utility facilities are to be established and accurately dimensioned on sketches from surveyed centerline of road right of way.not from right of <br /> way(border)lines. <br /> The Department of Public Works, Field Inspection Section shall receive a notice at least forty-eight hours prior to beginning any work within the <br /> County right of way. All work performed under this permit shall conform to the rules and regulations pertaining to safety established by the <br /> California Division of Industrial Safety and Cal-OSHA. <br /> The jobsite shall be kept in a safe condition at all times by the daily removal of any excess dirt or debris which might be a hazard to either <br /> pedestrian or automobile traffic. All necessary traffic convenience and warning devices and personnel shall be provided,placed and maintained <br /> by and at the sole expense of the:Permittee in accordance with the latest edition of the CALTRANS Manual of Traffic Control. <br /> After completion of the work pennitted herein,all debris,lumber,barricades,or any excess material shall be removed and the jobsite left in a <br /> neat workmanlike manner. Immediately following completion of construction permitted herein,Permittee shall fill out and mail notice of <br /> completion provided by Grantor. <br /> Special Instructions" SEE ATTACHED PLANS*****TRAFFIC CONTROL PLAN PER CURRENT MANUAL OF UNIFORM TRAFFIC <br /> CONTROL DEVICE(MUTCD)CALIFORNIA SUPPLEMENT*****ALL ADJACENT RESIDENTS AND BUSINESSES <br /> SHALL BE NOTIFIED OF THE NIGHT WORK 48-HOURS PRIOR TO START OF WORK***"CONTRACTOR <br /> SHALL CONDUCT"NOISY"OPERATIONS,SUCH AS PAVEMENT REMOVAL,EARLY IN THE <br /> EVENING* **CONTRACTOR SHALL USE SAN JOAQUIN COUNTY STANDARD R-29 FOR BACKFILLING***** <br /> THOMAS R. FLINN, Director <br /> Department of Public Works <br /> Est. Permit Fee: $615.00 <br /> FORMS: SS/WW, R-29 - -- By <br /> WHITE Permittee Permit Section <br /> GOLDENROD PWD Central File <br /> YELLOW Field Inspection PW 27 <br /> PINK Permit Section <br /> Access\Permits\Forms\Encroachment Permit Revised 07/2000 <br />