Laserfiche WebLink
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> Additional conditions applicable after November 1, 2007: <br /> 1. All trenches shall be completely backfilled at the end of each work day. <br /> 2. Drainage ditches shall remain open and in pre-construction condition at the end of each <br /> work day. <br /> 3. Above normal dust control measures, streets shall be maintained in a clean condition, free <br /> of dirt, mud and debris during construction activities. The contractor shall provide daily, or <br /> as needed, street sweeping using a modern mechanical or vacuum-assisted street <br /> sweeper. <br /> 4. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />