Laserfiche WebLink
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 14. Drainage ditches shall remain open and in pre-construction condition at the end of each work <br /> day. <br /> 15. Above normal dust control measures, streets shall be maintained in a clean condition, free of dirt, <br /> mud and debris during construction activities. The contractor shall provide daily, or as needed, <br /> street sweeping using a modern mechanical or vacuum-assisted street sweeper. <br /> 16. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />