My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-337
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-337
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:46:52 AM
Creation date
12/30/2015 10:15:44 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-337
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
CALIFORNIA WATER SERVICE
Contracts
CrossReference
Date Entered
10/31/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
VARIOUS ROADS
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Special Conditions for -2- <br /> ENCROACHMENT PERMIT <br /> 14. Roadway areas subject to pavement cuts shall receive a 0.12-foot asphalt concrete overlay from <br /> the centerline (or lane line) to the edge of the traveled way. If the pavement is disturbed on both <br /> sides of the centerline (or adjacent lane), then the entire roadway (or affected lanes) shall be <br /> resurfaced. All pavement conforms shall be ground to provide a flush surface. Contractor shall <br /> grind and overlay within 10 working days of permanent trench paving. Shoulder areas shall be <br /> brought up to the finish grade as directed by the County. <br /> 15. Contractor shall establish existing roadway and drainage grades within the construction area. <br /> Any repair to roadways and adjacent areas shall match existing grades. Any proposed grade <br /> changes shall receive prior approval from County. <br /> 16. School buses shall be passed through the work zone with minimal delay. Children walking to <br /> school shall be escorted through the work zone. <br /> 17. A report describing a public information campaign to inform affected residents and businesses shall be <br /> submitted to the County for approval prior to beginning work. <br /> Additional conditions applicable after November 1, 2007: <br /> 1. All trenches shall be completely backfilled at the end of each work day. <br /> 2. Drainage ditches shall remain open and in pre-construction condition at the end of each <br /> work day. <br /> 3. Above normal dust control measures, streets shall be maintained in a clean condition, free <br /> of dirt, mud and debris during construction activities. The contractor shall provide daily, or <br /> as needed, street sweeping using a modern mechanical or vacuum-assisted street <br /> sweeper. <br /> 4. The contractor shall not conduct construction operations in rain or heavy fog conditions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.