Laserfiche WebLink
UFI-IL;E USE UNLY <br /> PROJECT APPLICATION <br /> FEE SCHEDULE <br /> GEOPHYSICAL SURVEY $255 <br /> Agreement Annuals <br /> $115 or 11 r <br /> ENCROACHMENT PERMIT Time and Material Tim d Material <br /> Driveway with or without pipe $95 <br /> Driveway with Box Culvert $155 <br /> Paved Frontage $100+$0.46/ft. <br /> Curb, Gutter, and/or Sidewalk $100+$0.98/ft. <br /> Bell Holes,Cross-cuts,Splicepits $100/location 7Z)O �DG <br /> Bore(up to 6"Dia.) $100/location .x it <br /> "bo <br /> Bore(over 6' Dia.) $100+$19M. <br /> DIRT: <br /> 0-100 ft. $100+$0.49/ft. <br /> >100-1,000 ft. - +$0.30/ft. <br /> >1,000 ft. +$0.10/ft. <br /> PAVED: <br /> 0-100 ft. $100.00+$0.69/ft. <br /> >100-1,000 ft. +$0.40/ft. <br /> >1,000 ft. +$0.20/ft. <br /> 7!Single Trip $20 <br /> Blanket Permit $90 <br /> Custom Actual Cost <br /> ($160.00 MIN) <br /> J 6� <br /> TOTAL ,�1 j— <br />