My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-342
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:46:57 AM
Creation date
12/30/2015 10:17:00 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-342
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
PRESTON PIPELINES , INC.
Contracts
CrossReference
Date Entered
11/2/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
W/S OF THORNTON RD.
Primary Parcel
Type (2)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRESTON PIPELINES <br /> General Engineering Contractor <br /> License#367660 <br /> October 30, 2007 JOB FILE 407-072 <br /> San Joaquin County Public Works <br /> 1810 E. Hazelton Avenue, <br /> PO Box 1810 <br /> Stockton CA 95201 <br /> Attn: Ben Neely//Fax: (209)953-7424//Phone (209)468-3017 <br /> RE: Traffic Control Panel, Flag City <br /> Ben, <br /> Please see the attached traffic control plan. Our goal is to complete the project as safely and <br /> effectively as possible. Because this project is in close proximity to existing roadways, the need <br /> for traffic control is required. We are proposing three different options to maintain traffic while <br /> our crew completes the proposed force main work. <br /> e to ' n i cl the a t affi nd ou oun e jo te. ro <br /> c ure ou app in e ere has Be se sop ' eli ' ate e po tia or <br /> Y icu tra , it be nsi e e lea is k opti See eets -2 t T - fo <br /> th optt <br /> The second option is to place flagmen on either side on our work zone. See sheet TC-5. <br /> eiily�h opi is usuttatelagri ( prafl5�sigls) ili�ieuflaien�2e� <br /> tSC <br /> We are asking that the County approves all three options. If any option is disputed please mark <br /> the sheet appropriately. Because this job is time sensitive, we would ask for a response as soon <br /> as possible. <br /> Thank you, <br /> i <br /> Chad Hutchinson <br /> Project Manager, Central Valley <br /> Central Valley Office Corporate Office <br /> 12833 S. Manthey Road 133 Bothelo Avenue <br /> Lathrop CA 95330 www.prestonpipelines.com Milpitas CA 95035 <br /> 209-983-6500 408-262-1418 <br /> 209-983-6508 Fax 408-262-1870 Fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.