My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.05 RESPONSIBILITY AND CARE OF EQUIPMENT <br /> A. The Contractor shall be responsible for the equipment included in this Contract <br /> until it has been finally inspected, tested and accepted in accordance with the <br /> requiremerts of these Specifications. <br /> B. The Contractor shall make his own provisions for properly storing and protecting <br /> all materia and equipment against theft, injury or damage from any and all <br /> causes. Damaged material and equipment shall not be used in the work. <br /> 1.06 FACTORY TESTS <br /> Factory tests shall be performed for each piece of equipment where specifically called for in the <br /> Section specifying that equipment. Note that factory tests are inherent in many reference <br /> standards. The requirement for a factory test in a referenced standard shall make that <br /> requirement a part of these Specifications. Conduct factory tests at the same speeds at which <br /> the equipment will operate in the field, except as noted. <br /> Where specifically noted, performance tests may be witnessed by the Engineer. The Contractor <br /> shall inform the Engineer in sufficient time to allow arrangements to be made for witness of such <br /> tests. When non-witnessed tests are performed, certified results shall be supplied by the <br /> Contractor. <br /> Factory testing of pumps shall be done in accordance with the requirements and Standards of <br /> the Hydraulic Institute except where otherwise noted. Tests of other equipment shall conform to <br /> the requirements set forth in these Specifications. <br /> 1.07 MEASUREMENT AND PAYMENT <br /> No measurement will be made. Full compensation for conforming to these requirements, <br /> including all the labor, materials, tools, equipment, incidentals and for doing all the work <br /> involved in this section necessary for completion of the work, as shown on the Contract Plans, <br /> as specified in the Standard Specifications, these special provisions and as directed by the <br /> Engineer, shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> PART 2— PRODUCTS <br /> 2.01 DESIGN <br /> A. General: <br /> All equipment shall be designed for the service intended, shall be of rugged <br /> construction, of ample strength for all stresses which may occur during fabrication, <br /> transportation, erection and during continuous or intermittent operation, shall be <br /> adequately stayed, braced and anchored, and shall be installed in a neat and <br /> workmanlike mariner. Appearance and safety, as well as utility, shall be given <br /> consideration in the design of details. Materials of construction shall be cathodically <br /> compatible. <br /> July 2007 Division III-112 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.