Laserfiche WebLink
3.04 DAMAGED PRODUCTS <br /> A. Damage products will not be accepted. All damaged products shall be replaced with <br /> new products at no additional cost to the Owner. <br /> 3.05 FASTENERS & LUGS <br /> A. Fasteners for securing equipment shall be stainless steel. The fastener size shall <br /> match equipment mounting holes. <br /> B. All wire & cable lugs shall be copper; aluminum or aluminum alloy lugs shall not be _. <br /> used. The Electrical Contractor shall supply all lugs to match the quantity & size of <br /> wire listed in the conduit & wire routing schedule. <br /> 3.06 INSTALLATION, GENERAL <br /> A. System <br /> 1. Install all products per manufacturer's recommendations and the Drawings. — <br /> 2. Contract Drawings are intended to show the basic functional requirements of <br /> the electrical system and instrumentation system and do not relieve the <br /> Contractor from the responsibility to provide a complete and functioning <br /> system. <br /> B. Provide all necessary hardware, conduit,terminal blocks,wiring,fittings, and devices <br /> to connect the electrical equipment provided under other Sections. The following <br /> shall be done by the Contractor at no additional cost to the Owner: <br /> 1. Provide additional devices, wiring, terminal block, conduits, relays, signal - <br /> converters, isolators, boosters,and other miscellaneous devices as required to <br /> complete interfaces of the electrical and instrumentation system. <br /> 2. Changing normally open contacts to normally closed contacts or vice versa. <br /> 3. Adding additional relays to provide more contacts as necessary. <br /> 4. Installing additional terminal blocks to land wires. <br /> C. All programmable devices, shall be programmed, set-up and tested by the <br /> Contractor prior to start of witness testing. This includes LLC, and instrumentation. <br /> Programming and set-up parameters shall be adjusted or changed as directed by the <br /> Owner or Engineer during start-up and throughout the warranty period, at no <br /> additional cost to the Owner. Coordinate with the Owner and setup all alarm, <br /> process, time delays and operation setpoints. <br /> D. Panels and Enclosures <br /> 1. Install panels and enclosures at the location shown on the Plans or approved — <br /> by the Engineer. <br /> 2. Install level and plumb. — <br /> 3. Clearance about electrical equipment shall meet the minimum requirements of <br /> NEC 110-26. <br /> 4. Box supports shall be located and oriented as directed in field by Owner. <br /> Division III-215 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos.7468, 7589, 7590 <br />