My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
upsets, start-up, shutdown, power failure, and equipment <br /> failure conditions. <br /> 8. The factory test will be considered complete only when the integrated system <br /> has successfully passed all tests to the satisfaction of the Owner or Engineer <br /> and the Factory Test checkout form TF11 has been signed &dated by Owner. <br /> No electrical equipment shall be shipped to jobsite without authorization from <br /> the Owner or Engineer that the factory test has been completed. <br /> 9. Acceptance and witnessing of the factory tests does not relieve or exclude the <br /> Contractor from conforming to the requirements of the Contract Documents. <br /> 10. The testing personnel shall provide all material, equipment, labor and technical <br /> supervision to perform such tests and inspections. <br /> 11. During the testing period, under the supervision of the supplier, the Engineer <br /> and other Owner personnel shall have unlimited and unrestricted access to the <br /> usage and testing of all hardware and software in the system. <br /> 12. Spare parts for the system shall also be tested during this test period. The <br /> supplier shall prove by temporarily connecting the spare hardware to the <br /> system that any or all of the spare parts function in a manner equivalent to the <br /> original equipment under test. <br /> 13. The Contractor shall pay all expenses incurred by his personnel which <br /> includes labor, material, transportation, lodging, daily subsistence, and other <br /> associated incidental costs during the factory testing. <br /> 14. Faulty and/or incorrect hardware operation of major portions of the system <br /> may, at the discretion of the Owner Engineer, be cause for suspension or <br /> restarting of the entire factory test, at no additional cost to the Owner or <br /> extension in contract time. <br /> 15. The factory test will be considered complete only when the system setup has <br /> successfully passed all tests both structured and unstructured to the <br /> satisfaction of the Owner Engineer. No equipment shall be installed without <br /> authorization from the Owner Engineer that the factory test has been <br /> completed. <br /> 16. All modifications to drawings and documentation as a result of the factory tests <br /> shall be corrected and completed before shipment of drawings with equipment <br /> and the submittal and delivery of`operation and maintenance" manuals. <br /> 17. Copies of the completed, signed, and witnessed factory testing forms shall be <br /> planed in the Operation and Maintenance Manual. <br /> E. Electrical Field Tests <br /> 1. The Contractor shall engage and payfor the services of an approved qualified <br /> testing company for the purpose of performing inspections and tests as herein <br /> specified. The testing company shall provide all material, equipment, labor and <br /> technical supervision to perform such tests and inspections. The Electrical <br /> Contractor shall be present on site for all field tests. <br /> 2. Pre-Energization Tests: These tests shall be completed prior to applying <br /> power to any equipment. <br /> July 2007 Division III-222 NEI Phase II Water and Sewer <br /> CIP Nos. 7468, 7589, 7590 <br />
The URL can be used to link to this page
Your browser does not support the video tag.