b) Compare equipment nameplate data with design plans. <br /> c) Compare breaker legend for accuracy. <br /> d) Check torque of bolted connections. <br /> 2) The Contractor shall fill in Panelboard Test Form TF5 located in <br /> Appendix"A". <br /> f. Breaker Tests <br /> 1) All breakers shall be checked for proper mounting, conductor size, <br /> and feeder designation. Operate circuit breaker to ensure smooth <br /> operation. Inspect case for cracks or other defects. Check <br /> tightness of connection with torque wrench in accordance with _. <br /> manufacturer's recommendations. <br /> 2) All breakers 100 amps and above shall be tested, including the <br /> generator breaker. Time current characteristic tests shall be <br /> performed bypassing three hundred percent(300%)rated current <br /> through each pole separately. Trip time shall be determined. <br /> Instantaneous pickup current shall be determined by run up or <br /> pulse method. Clearing times should be within four (4) cycles or <br /> less. All trip times shall fall within NETA Table values. <br /> Instantaneous pickup current levels should be within 20% of <br /> manufacturer's published values. Certification stickers, listing date <br /> and company who performed the tests, shall be attached to the <br /> inside of the breaker compartment door right after the breaker has <br /> passed all tests. <br /> 3) Contact and Insulation Resistance: Contact resistance shall be <br /> measured and be compared to adjacent poles and similar <br /> breaker. Deviations of more than 50% shall be reported to <br /> Engineer. Insulation resistance shall be measured and shall not <br /> be less than 100 megohms. -- <br /> 4) After the completion of all breaker tests, all TM & MCP breakers <br /> shall be set by Contractor to their proper settings to protect <br /> equipment. <br /> 5) The Contractor shall fill in Breaker Test Form TF8 located in <br /> Appendix "A". _ <br /> 3. Post Energization Tests <br /> a. Panels and Electrical Enclosure Tests _ <br /> 1) During these tests,test all local and remote control operations and <br /> interlocks. <br /> 2) Electrical Tests <br /> a) Per form operational tests by initiating control devices to <br /> affect proper operation. _ <br /> Division III-225 NEI Phase II Water and Sewer <br /> July 2007 CIP Nos. 7468, 7589, 7590 <br />