My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-349
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:06 AM
Creation date
12/30/2015 9:55:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-349
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
ZABIH ZACA
Contracts
CrossReference
Date Entered
11/16/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
FROM CHRISMAN RD. ALONG THE S/S OF 11th ST.
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SPT11 W - 3rd Stage Start Delay Seconds <br /> SPT11X - 3rd Stage Stop Delay Seconds <br /> TIMERS: <br /> K11 S - 1 st Stage Start Timer Seconds <br /> K1 1T - 1st Stage Stop Timer Seconds <br /> K11 U - 2nd Stage Start Timer Seconds <br /> K11 V - 2nd Stage Stop Timer Seconds <br /> K11W - 3rd Stage Start Timer Seconds <br /> K11 X - 3rd Stage Stop Timer Seconds <br /> COUNTERS/TOTALIZERS: <br /> None <br /> CONTROL: <br /> The following (part a, b) is a typical control for the switch S11A. All switches <br /> (S11 B, -;11C) set/reset shall follow S11A format: <br /> If L5'I is above 1 st stage pump start SP11 S <br /> for the duration of start delay SPT11 S (timer K11 S); <br /> then set 1st stage switch S1 1A. <br /> If: L51 is below 1st stage pump stop SP1 1T <br /> for the duration of stop delay SPT11T (timer K11T); <br /> then reset 1st stage switch S11A. <br /> The sequence of the order for pumps to be called shall be per the code <br /> number set in register SP1 1A. When a new code number is set in register <br /> SP1 1A the sequence shall be changed per the following definitions: <br /> PUMP CALL SEQUENCE <br /> LOGICAL OUTPUT <br /> CODE <br /> NUMBER Pump P1 Pump P2 Pump P3 Pump P4 <br /> SET IN Call X1 U Call X2U Call X3U Call X4U <br /> SP11A Assignment to Assignment to Assignment to Assignment to <br /> 0 Rotate Rotate Rotate Rotate <br /> 123 S'l1A S11B S11C --- <br /> 234 -- S11A S11B S11C <br /> 341 Si 1C -- S11A S11B <br /> 412 S11B S11C -- S11A <br /> 124 S11A S11B -- S11C <br /> 132 S11A S11C S11B -- <br /> 142 S11A S11C -- S11B <br /> 134 S1 1A -- S11B S11 C <br /> 143 S11A -- S11C S11B <br /> 312 S11B S11 C S11A -- <br /> 314 S11B -- S11A S11C <br /> 413 S11B -- S11C S11A <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.