Laserfiche WebLink
ADDENDUM NO. 1 <br /> Date: August 8, 2007 <br /> Plan Holders of: NORTHEAST INDUSTRIAL PHASE II WATER AND SWER — <br /> PROJECT, CIP Nos. 7468, 7589, & 7590 <br /> All prospective bidders are hereby notified that modification and/or changes are to be <br /> made to the specifications, plans and proposal documents for this project, as entitled <br /> above. <br /> The following items indicate additions and/or deletions to the above referenced <br /> documents, and are hereby made a part thereof and are subject to all applicable <br /> requirements there under as if originally shown and/or specified. _. <br /> Bidders must sign and attach one (1) copy of this Addendum No. 1 to his/her proposal <br /> as acknowledgment of receipt of these instructions, and that said Addendum was _ <br /> properly evaluated in his/her proposal. Any proposal not in compliance with this <br /> requirement may be rejected. <br /> The documents of this project are hereby changed as follows: <br /> ITEM No. 1 <br /> Change cost of Plans & Specifications on Sheet 1 of Division I from $30.00 & <br /> $40.00 to $75.00 & $90.00. <br /> ITEM No. 2 <br /> Add the following statement at the end of Paragraph 1 of Sheet 1 of Division I: <br /> The Plans & Specifications may be purchased from the Engineering Division at <br /> 520 N. Tracy Boulevard, Tracy, California. <br /> All other items remain unchanged. <br /> v^ <br /> Kul Sharma _ <br /> City Engineer <br /> Addendum No. 1 is hereby acknowledged by the bidder's signature. <br /> Name of Bidder's Company Authorized Signature -- <br /> Date Title — <br /> END OF ADDENDUM NO. 1 <br /> Addendum No. 1 8-Aug-07 <br /> CIP 7722—CNG Fueling Facility Expansion <br />