Laserfiche WebLink
ENCROACHMENT PERMIT <br /> GENERAL PROVISIONS <br /> 1. This permit is issued under and subject to at l laws and ordinances of agencies governing the encroachment herein permitted. See the <br /> following references: <br /> STREFTS AND HIGHWAYS CODE <br /> 1.Division 1,Chapter 3 <br /> 2.Division 2,Chapter 2,Section 942 <br /> 3,Division 2,Chapter 4,Section 1126 <br /> 4.Division 2,Chapter 6 <br /> MBERED: 324,441,648, 662,672,695,700, 860,and 892. <br /> SAN JpAQUIN COUNTY ORDINANCES NU <br /> l constitute an <br /> ceptance of all <br /> 2. It is understood and agreed by the Permittee that the doing of an art to comply with y work under any prois vision)will be cause for crevo revocation of this <br /> e <br /> provisions contained herein and failure on the P P <br /> permit. Except as otherwise provided for public agencies and franchise holders,this permit is revocable on five days notice. <br /> ng the <br /> 3. All work shall be done subject to the supervisionh <br /> du <br /> and satisfaction <br /> ta condition grantor.as il <br /> possible d ibla Permittee. times pon completion ofthe work <br /> progress of the work keep the County Highway is as neat <br /> granted herein, shall leave the County Highway in a thoroughly neat,clean and usable condition. <br /> ucture <br /> by the <br /> 4. The Permittee also agrees by the acceptance of immediately is Permit re air anPyginjurY to any porterly maintain ion of the highwayy encroachment �rwh ch occurs as a result of Permittee <br /> on <br /> any part of the County Highway and to imm Y P <br /> maintenance of the said encroachment structure, til c time <br /> San s thePnrimttee may be relieved of the responsibility of such <br /> maintenance of the encroachment structure by the County <br /> 5. The Permittee also agrees by the acceptance of this permit to make,at its own expense, such repairs as may be deemed necessary by <br /> the County Director of Public Works or his representative. <br /> nce <br /> hway may. <br /> 6. Itis further agreed by the Permittee that capon reqconstruction,reconstruction or uest of the County Department of Public aWorks work <br /> immediately moved by and at <br /> the installation provided for herein shall,upon q <br /> the sole expense of the Permittee. <br /> ncroachment shall be borrowed or taken from within the County right of <br /> 7. No material used for fill or backfill in the construction of the e <br /> way. <br /> te.to the <br /> 8. All work shall be planned and carried out so that therethe avement orill be as ltraveled way unless e inconvenience as Potherw se provided lh rein. Adequate ing public. No t <br /> shall be stacked within eight feet(8') of the edge of p <br /> provision shall be made for the protection of the traveling public. arri work in ll beprogplaced,With approved Signs and lights at light, <br /> and flagmen shall be employed,all as may be requiredy particular <br /> lity for <br /> injury or <br /> 9, The Permittee,by the acceptance ofe work herein perml assume full itted d or whichsponsibility for may arise out oflthe failure oft espartlof the Permitte damage <br /> do the <br /> property which may arise out permit.the wo P <br /> work provided for under this yetereof,the Permittee shall defend, indeof such mnify,fy,and hold ithem and each of them harmlesin osrany <br /> for such <br /> department, official or employee thereof, <br /> claim. <br /> requir <br /> 10. All backfill material is to be moistened n thoroughly <br /> or crushed compact <br /> rock� with mechanical The Permittee shall maintain the seudrfaceby hove�unty <br /> Director of Public Works, such backfill shall consist <br /> structures placed hereunder as may be necessaryt o insure <br /> PublctWorksr of the r roadway gravel crushed rock or asphalt sptetely Stable urf cing is cut or <br /> lieve <br /> of such responsibility by the County croartmen <br /> damaged in the work of placing an encroachment bereplacedinkind,and the rrial oadway bshall be left in at least asrgood a condition a It <br /> Y <br /> as.nearly as possible.in its original state or shallp <br /> was before the commencement of operations of placing the encroachment structure. <br /> 11. Whenever necessary to, secure permission from abutting property owners, such authority must be secured by the Permittee prior to <br /> starting work.. <br /> It be given every consideration in the location and type of construction. <br /> 12. The future safety and convenience of the traveling public sha <br />