My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Small Business preference will be a reduction in the bid submitted by the Small Business contractor, for bid <br /> comparison purposes, by an amount equal to 5 percent of the amount bid by the apparent low bidder, the amount not to <br /> exceed$50,000. If this reduction results in the Small Business contractor becoming the low bidder,or in a precise tie with a <br /> Non-Small Business apparent low bidder,then the contract will be awarded to the Small Business contractor on the basis of <br /> the actual bid of the Small Business contractor notwithstanding the reduced bid price used for bid comparison purposes. <br /> The Non-Small Business Subcontractor preference will be a reduction in the bid submitted by the Non-Small Business <br /> contractor requesting the preference, for bid comparison purposes,by an amount equal to 5 percent of the amount bid by the <br /> apparent low bidder, the amount not to exceed $50,000. If this reduction results in the Non-Small Business contractor <br /> requesting the preference becoming the low bidder, or in a precise tie with a Non-Small Business apparent low bidder not <br /> requesting the preference,then the contract will be awarded to the Non-Small Business contractor requesting the preference <br /> on the basis of its actual bid notwithstanding the reduced bid price used for bid comparison purposes. Application of the <br /> Non-Small Business Subcontractor preference shall not result in the displacement of a Small Business in winning the award. <br /> Attention is also directed to"California Company Preference"of these special provisions. <br /> The amount of the California company reciprocal preference shall be equal to the amount of the preference applied by <br /> the state of the nonresident contractor with the lowest responsive bid,except where the"California company"is eligible for a <br /> California Small Business Preference or a California Non-Small Business Subcontractor Preference, in which case the <br /> preference applied shall be the greater of the two,but not both. <br /> If the bidder submitting the lowest responsive bid is not a "California company" and with the benefit of the reciprocal <br /> preference,a"California company's"responsive bid is equal to or less than the original lowest responsive bid,the "California <br /> company"will be awarded the contract at its submitted bid price except as provided below. <br /> Small Business bidders shall have precedence over Non-Small Business bidders in that the application of the"California <br /> company" preference for which Non-Small Business bidders may be eligible shall not result in the denial of the award to a <br /> Small Business bidder. <br /> DVBE bidders shall have precedence over Non-DVBE bidders in that in the event the application of the Small Business <br /> preference to more than one bidder results in a precise tie in the bid amounts used for comparison purposes, the award shall <br /> go to the DVBE that is also a small business. This precedence shall not apply to the application of the California company <br /> reciprocal preference. <br /> SECTION 4. BEGINNING OF WORK,TIME OF COMPLETION,AND LIQUIDATED DAMAGES <br /> The first working day is the 90 day after contract approval. <br /> Within 15 days after approval of the contract,the Contractor shall furnish the Engineer a statement from the vendor that <br /> the order for the sign panels and electrical materials has been received and accepted by the vendor. The statement shall give <br /> the dates that the sign panels and electrical materials will be shipped. If the Contractor has the materials on hand, a vendor's <br /> statement will not be required. <br /> The Contractor shall not begin work at the job site, except for measuring controlling field dimensions and locating <br /> utilities,until the sign panels and electrical materials have been received. <br /> The Contractor may begin work at the job site before the first working day if <br /> L The sign panels and electrical materials are received before the first working day or the Contractor has the materials <br /> on hand <br /> 2. Authorized by the Engineer in writing <br /> The 72-hour advance notice specified in Section 8-1.03, "Beginning of Work," of the Standard Specifications is changed <br /> to 5 days. <br /> The work shall be diligently prosecuted to completion before the expiration of 40 WORKING DAYS. <br /> The Contractor shall pay to the State of California the sum of$1,900 per day for each day's delay in finishing the work in <br /> excess of the number of working days specified above. <br /> SECTION 5. GENERAL <br /> SECTION 5-1. MISCELLANEOUS <br /> 5-1.01 PLANS AND WORKING DRAWINGS <br /> When the specifications require working drawings to be submitted to the Division of Structure Design, the drawings <br /> shall be submitted to: Division of Structure Design, Documents Unit, Mail Station 9, 1801 30th Street, Sacramento, CA <br /> 95816,Telephone 916 227-8252. <br /> Contract No. 10-OM7104 <br /> 105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.