5-1.05 TESTING <br /> Testing of materials and work shall conform to the provisions in Section 6-3, "Testing," of the Standard Specifications <br /> and these special provisions. <br /> Whenever the provisions of Section 6-3.01, "General," of the Standard Specifications refer to tests or testing, it shall <br /> mean tests to assure the quality and to determine the acceptability of the materials and work. <br /> The Engineer will deduct the costs for testing of materials and work found to be unacceptable,as determined by the tests <br /> performed by the Department,and the costs for testing of material sources identified by the Contractor which are not used for <br /> the work,from moneys due or to become due to the Contractor. The amount deducted will be determined by the Engineer. <br /> 5-1.06 REMOVAL OF ASBESTOS AND HAZARDOUS SUBSTANCES <br /> When the presence of asbestos or hazardous substances are not shown on the plans or indicated in the specifications and <br /> the Contractor encounters materials which the Contractor reasonably believes to be asbestos or a hazardous substance as <br /> defined in Section 25914.1 of the Health and Safety Code, and the asbestos or hazardous substance has not been rendered <br /> harmless, the Contractor may continue work in unaffected areas reasonably believed to be safe. The Contractor shall <br /> immediately cease work in the affected area and report the condition to the Engineer in writing. <br /> In conformance with Section 25914.1 of the Health and Safety Code, removal of asbestos or hazardous substances <br /> including exploratory work to identify and determine the extent of the asbestos or hazardous substance will be performed by <br /> separate contract. <br /> If delay of work in the area delays the current controlling operation,the delay will be considered a right of way delay and <br /> the Contractor will be compensated for the delay in conformance with the provisions in Section 8-1.09, "Right of Way <br /> Delays,"of the Standard Specifications. <br /> 5-1.065 SOLID WASTE DISPOSAL AND RECYCLING REPORT <br /> This work shall consist of reporting disposal and recycling of construction solid waste, as specified in these special <br /> provisions. For the purposes of this section,solid waste includes construction and demolition waste debris,but not hazardous <br /> waste. <br /> Annually by the fifteenth day of January, the Contractor shall complete and certify Form CEM-4401, "Solid Waste <br /> Disposal and Recycling Report," which quantifies solid waste generated by the work performed and disposed of in landfills <br /> or recycled during the previous calendar year. The amount and type of solid waste disposed of or recycled shall be reported <br /> in tons. The Contractor shall also complete and certify Form CEM-4401 within 5 days following contract acceptance. <br /> Form CEM-4401,"Solid Waste Disposal and Recycling Report"can be downloaded from the following website: <br /> http://www.dot.ca.gov/hq/'construc/manual200l <br /> If the Contractor has not submitted Form CEM-4401, by the dates specified above, the Department will withhold the <br /> amount of$10,000 for each missing or incomplete report. The moneys withheld will be released for payment on the next <br /> monthly estimate for partial payment following the date that a complete and acceptable Form CEM-4401 is submitted to the <br /> Engineer. Upon completion of all contract work and submittal of the final Form CEM-4401, remaining withheld funds <br /> associated with this section, "Solid Waste Disposal and Recycling Report,"will be released for payment. Withheld funds in <br /> conformance with this section shall be in addition to other moneys withheld provided for in the contract. No interest will be <br /> due the Contractor on withheld amounts. <br /> Full compensation for preparing and submitting Form CEM-4401, "Solid Waste Disposal and Recycling Report," shall <br /> be considered as included in the contract price for the various items of work involved and no additional compensation will be <br /> allowed therefor. <br /> 5-1.07 (BLANK) <br /> 5-1.08 (BLANK) <br /> 5-1.09 SUBCONTRACTING <br /> Attention is directed to the provisions in Section 8-1.01, "Subcontracting," of the Standard Specifications, Section 2, <br /> "Proposal Requirements and Conditions,"and Section 3,"Award and Execution of Contract,"of these special provisions. <br /> Pursuant to the provisions in Section 1777.1 of the Labor Code,the Labor Commissioner publishes and distributes a list <br /> of contractors ineligible to perform work as a subcontractor on a public works project. This list of debarred contractors is <br /> available from the Department of Industrial Relations web site at: <br /> http://www.dir.ca.gov/DLSE/Debar.html <br /> Contract No. 10-OM7104 <br /> 109 <br />