Laserfiche WebLink
1. Trash deposits or clearly defined disposal pits containing tin cans,bottles,ceramic dishes,or other refuse indicating <br /> previous occupation or use of the site <br /> 2. Structural remains of stone,brick,concrete,wood,or other building material found above or below ground or <br /> 3. Human skeletal remains from the historic period,with or without coffins or caskets,including any associated grave <br /> goods <br /> Prehistoric Native American archaeological materials include: <br /> 1. Human skeletal remains or associated burial goods such as beads or ornaments _ <br /> 2. Evidence of tool making or hunting such as arrowheads and associated chipping debris of fine-grained materials <br /> such as obsidian,chert,or basalt <br /> 3. Evidence of plant processing such as pestles,grinding slabs,or stone bowls <br /> 4. Evidence of habitation such as cooking pits,stone hearths,packed or burnt earth floors or <br /> 5. Remains from food processing such as concentrations of discarded or burnt animal bone,shellfish remains,or burnt <br /> rocks used in cooking <br /> Immediately upon discovery of archaeological materials, stop all work within a 18.5 meter radius of the archaeological <br /> materials and immediately notify the Engineer. Archaeological materials found during construction are the property of the <br /> State. Do not resume work within the 18.5 meter radius of the fmd until the Engineer gives you written approval. If,in the <br /> opinion of the Engineer, completion of the work is delayed or interfered with by reason of an archeological find or <br /> investigation or recovery of archeological materials,you will be compensated for resulting losses and an extension of time <br /> will be granted in the same manner as provided for in Section 8-1.09,"Right of Way Delays,"of the Standard Specifications. <br /> The Department may use other forces to investigate and recover archaeological materials from the location of the find. <br /> When ordered by the Engineer furnish labor,material,tools and equipment,to secure the location of the find,and assist in the <br /> investigation or recovery of archaeological materials and the cost will be paid for as extra work as provided in Section <br /> 4-1.03D,"Extra Work,"of the Standard Specifications. <br /> Full compensation for immediately notifying the Engineer upon discovery of archaeological materials and leaving <br /> undisturbed and in place archaeological materials discovered on the job site shall be considered as included in the contract <br /> price paid for various items of work involved and no additional compensation will be allowed therefor. <br /> 5-1.11 AREAS FOR CONTRACTOR'S USE <br /> Attention is directed to the provisions in Section 7-1.19, "Rights in Land and Improvements," of the Standard <br /> Specifications and these special provisions. <br /> The highway right of way shall be used only for purposes that are necessary to perform the required work. The <br /> Contractor shall not occupy the right of way,or allow others to occupy the right of way,for purposes which are not necessary <br /> to perform the required work. <br /> No State-owned parcels adjacent to the right of way are available for the exclusive use of the Contractor within the <br /> contract limits. The Contractor shall secure, at the Contractor's own expense, areas required for plant sites, storage of <br /> equipment or materials,or for other purposes. <br /> No area is available within the contract limits for the exclusive use of the Contractor. However,temporary storage of <br /> equipment and materials on State property may be arranged with the Engineer, subject to the prior demands of State <br /> maintenance forces and to other contract requirements. Use of the Contractor's work areas and other State-owned property <br /> shall be at the Contractor's own risk, and the State shall not be held liable for damage to or loss of materials or equipment <br /> located within such areas. <br /> 5-1.12 PAYMENTS <br /> Attention is directed to Sections 9-1.06, "Partial Payments," and 9-1.07, "Payment After Acceptance," of the Standard <br /> Specifications and these special provisions. <br /> For the purpose of making partial payments pursuant to Section 9-1.06, "Partial Payments," of the Standard <br /> Specifications,the amount set forth for the contract items of work hereinafter listed shall be deemed to be the maximum <br /> value of the contract item of work which will be recognized for progress payment purposes: <br /> A. Lead Compliance Plan $3,500 <br /> After acceptance of the contract pursuant to the provisions in Section 7-1.17, "Acceptance of Contract,"of the Standard <br /> Specifications,the amount,if any,payable for a contract item of work in excess of the maximum value for progress payment <br /> purposes hereinabove listed for the item, will be included for payment in the first estimate made after acceptance of the <br /> contract. - <br /> Contract No. 10-OM7104 <br /> 112 <br />