My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2007
>
EP-07-301 thru EP-07-400
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2007_EP-07-301 thru EP-07-400_ - EP-07-352
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 10:47:10 AM
Creation date
12/30/2015 9:44:57 AM
Metadata
Fields
Template:
Permits_Development
DocName
EP-07-352
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2007\EP-07-301 thru EP-07-400
Year2
2007
Supplemental fields
Applicant
RICHARD A. HEAP ELECT. CONT.
Contracts
CrossReference
Date Entered
11/15/2007
Description
ENCROACHMENT PERMIT
DocCategory
Permit Applications (PA)
Notes
Owners
Parcel Address
INTERSECTION OF FRENCH CAMP RD. & I-5
Primary Parcel
Type (2)
Tags
Permits_Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Vehicle and Equipment Fueling and Maintenance <br /> The Contractor shall fuel or perform maintenance on vehicles and equipment off the construction site whenever <br /> practical. When fueling or maintenance must be done at the construction site,the Contractor shall designate a site, or sites, <br /> and obtain approval from the Engineer before using. The fueling or maintenance site shall be protected from storm water, <br /> shall be on level ground, and shall be located at least 15 m from drainage inlets or watercourses. The WPCM shall inspect <br /> the fueling or maintenance site regularly. Mobile fueling or maintenance shall be kept to a minimum. <br /> The Contractor shall use containment berms or dikes around the fueling and maintenance area. Adequate amounts of <br /> absorbent spill cleanup material and spill kits shall be kept in the fueling and maintenance area and on fueling trucks. Spill <br /> cleanup material and kits shall be disposed of immediately after use. Drip pans or absorbent pads shall be used during <br /> fueling or maintenance unless performed over an impermeable surface. <br /> Fueling or maintenance operations shall not be left unattended. Fueling nozzles shall be equipped with an automatic <br /> shutoff control. Vapor recovery fueling nozzles shall be used where required by the Air Quality Management District. <br /> Nozzles shall be secured upright when not in use. Fuel tanks shall not be topped-off. <br /> The Contractor shall recycle or properly dispose of used batteries and tires. <br /> Paving,Sealing,Sawcutting,and Grinding Operations <br /> The Contractor shall prevent the following material from entering storm drain systems or water courses: <br /> A. Cementitious material, <br /> B. Asphaltic material, <br /> C. Aggregate or screenings, <br /> D. Grinding or sawcutting residue, <br /> E. Pavement chunks,or <br /> F. Shoulder backing. <br /> The Contractor shall cover drainage inlets and use linear sediment barriers to protect downhill watercourses until paving, <br /> sealing, sawcutting, or grinding operations are completed and excess material has been removed. Drainage inlets and <br /> manholes shall be covered during the application of seal coat,tack coat,slurry seal,or fog seal. <br /> During the rainy season or when precipitation is predicted, paving, sawcutting, and grinding operations shall be limited <br /> to places where runoff can be captured. Seal coat,tack coat,slurry seal,or fog seal operations shall not begin if precipitation <br /> is predicted for the application or the curing period. The Contractor shall not excavate material from existing roadways <br /> during precipitation. <br /> The Contractor shall vacuum up slurry from sawcutting operations immediately after the slurry is produced. Slurry shall <br /> not be allowed to run onto lanes open to public traffic or off the pavement. <br /> The Contractor shall collect residue from portland cement concrete grinding operations with a vacuum attachment on the <br /> grinding machine. The residue shall not be left on the pavement or allowed to flow across the pavement. <br /> Material excavated from existing roadways may be stockpiled as provided in "Stockpile Management" of these special <br /> provisions if approved by the Engineer. Asphalt concrete chunks used in embankment shall be placed above the water table <br /> and covered by at least 0.3-m of material. <br /> Substances used to coat asphalt trucks and equipment shall not contain soap,foaming agents,or toxic chemicals. <br /> Thermoplastic Striping and Pavement Markers <br /> Thermoplastic striping and preheating equipment shutoff valves shall work properly at all times when on the <br /> construction site. The Contractor shall not preheat, transfer, or load thermoplastic within 15 m of drainage inlets or <br /> watercourses. The Contractor shall not fill the preheating container to more than 150 mm from the top. Truck beds shall be <br /> cleaned daily of scraps or melted thermoplastic. <br /> The Contractor shall not unload, transfer, or load bituminous material for pavement markers within 15 m of drainage <br /> inlets or watercourses. All pressure shall be released from melting tanks before removing the lid to fill or service. Melting <br /> tanks shall not be filled to more than 150 mm from the top. <br /> The Contractor shall collect bituminous material from the roadway after marker removal. <br /> Pile Driving <br /> The Contractor shall keep spill kits and cleanup material at pile driving locations. Pile driving equipment shall be parked <br /> over drip pans,absorbent pads,or plastic sheeting where possible. When not in use,pile driving equipment shall be stored at <br /> least 15 m from concentrated flows of storm water, drainage courses, or inlets. The Contractor shall protect pile driving <br /> equipment by parking it on plywood and covering it with plastic when precipitation is predicted. The WPCM shall inspect <br /> the pile driving area every day for leaks and spills. <br /> The Contractor shall use vegetable oil instead of hydraulic fluid when practical. <br /> Contract No. 10-OM7104 <br /> 143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.